West House Farm, Scruton, Northallerton, DL7 0RQ
1 Component Storage (Duration 2h) LEEMING SOLAR FARM LIMITED
Total Capacity: 3.77 MW
Components: 1
Technologies:
Storage (Duration 2h)
Unique CMUs: 1

Secondary Trading Contacts

Contact Information

Component Descriptions

18MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured an AR6 CFD, therefore BESS will be separately metered from Solar PV.

Used by 1 CMU

CMU Identifiers

Components at this Location

18MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured an AR6 CFD, therefore BESS will be separately metered from Solar PV.
CMU: LSFL03
Storage (Duration 2h) LEEMING SOLAR FARM LIMITED Parent: ASE UK Holdings Limited
Capacity Information:
De-Rated Capacity (Registry) 3.769
Connection/DSR Capacity 18
Anticipated Capacity 3.769