Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
7 Components Storage (Duration 1h) GSES 1 LIMITED
Total Capacity: 3.94 MW
Components: 7
Technologies:
Storage (Duration 1h)
Unique CMUs: 2

Secondary Trading Contacts

Component Descriptions

19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP

Used by 2 CMUs

Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.

Used by 1 CMU

CMU Identifiers

Components at this Location

19.500MW of battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP
CMU: AGLAR2
Storage (Duration 1h) GSES 1 LIMITED Parent: Gore Street Energy Storage Fund PLC
Capacity Information:
De-Rated Capacity (Registry) 3.892
Connection/DSR Capacity 19.5
Anticipated Capacity 3.892
CMU: HR1-22
Storage (Duration 1h) EDF ENERGY NUCLEAR GENERATION LIMITED Parent: EDF Energy Holdings Limited
Capacity Information:
Anticipated Capacity 473.81
Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
CMU: AGLAR2
Storage (Duration 1h) GSES 1 LIMITED Parent: Gore Street Energy Storage Fund PLC
Capacity Information:
De-Rated Capacity (Registry) 3.892
Connection/DSR Capacity 19.5
Anticipated Capacity 3.892