Search Map View Statistics Support Us Help Login Register
Binn EcoPark Glenfarg Perth Scotland PH2 9PX
1 Component Energy from Waste PAPREC ENERGIES BINN LIMITED
Total Capacity: 6.87 MW
Components: 1
Technologies:
Energy from Waste
Unique CMUs: 1

Secondary Trading Contacts

Contact Information

Component Descriptions

New Build Municipal waste incineration plant located in Perthshire, Scotland. It is based on one boiler supplying steam to a single turbine-generator. The CMU is connected to the Distribution Network

Used by 1 CMU

CMU Identifiers

Components at this Location

New Build Municipal waste incineration plant located in Perthshire, Scotland. It is based on one boiler supplying steam to a single turbine-generator. The CMU is connected to the Distribution Network
CMU: PEBL01
Energy from Waste PAPREC ENERGIES BINN LIMITED Parent: PAPREC UK LIMITED
Capacity Information:
De-Rated Capacity (Registry) 6.866
Connection/DSR Capacity 7.8
Anticipated Capacity 6.866