Search Map View Statistics Support Us Help Login Register
Persley Croft, The Parkway, Aberdeen, AB22 8AN
1 Component Storage (Duration 4h) PERSLEY CROFT BESS LTD
Total Capacity: 19.79 MW
Components: 1
Technologies:
Storage (Duration 4h)
Unique CMUs: 1

Secondary Trading Contacts

Contact Information

Component Descriptions

The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; ? 1No. 33 kilovolt (Kv) operator substation (23m x 7.4m x 4.45m); ? 1No. 33Kv distribution network operator (DNO) substation to facilitate network connection (8.7m x 5.7m x 3.5m); ? Office accommodation and welfare facilities (12.2m x 2.4m x 2.59m)

Used by 1 CMU

CMU Identifiers

Components at this Location

The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; ? 1No. 33 kilovolt (Kv) operator substation (23m x 7.4m x 4.45m); ? 1No. 33Kv distribution network operator (DNO) substation to facilitate network connection (8.7m x 5.7m x 3.5m); ? Office accommodation and welfare facilities (12.2m x 2.4m x 2.59m)
CMU: PCB001
Storage (Duration 4h) PERSLEY CROFT BESS LTD
Capacity Information:
De-Rated Capacity (Registry) 19.787
Connection/DSR Capacity 47.405
Anticipated Capacity 19.787