Search Map View Statistics Support Us Help Login Register
New Haven Erf, North Quay Rd, Newhaven, East Sussex, BN9 0AB
2 Components VEOLIA UK LIMITED
Total Capacity: N/A
Components: 2
Technologies:
N/A
Unique CMUs: 1

Secondary Trading Contacts

Contact Information

Component Descriptions

Energy from waste facility located in Newhaven East Sussex - . It is a municipal waste incineration plant. It is based on two boilers supplying steam to one turbine-generator. Exhaust steam is condensed in a Air cooled condenser. The site normally operates at baseload. The auxiliary load is self supplied by the generator prior to export metering. The connection capacity used is the summer one. The power factor used is 0.85 for this CMU.

Used by 1 CMU

CMU Identifiers

Components at this Location

Energy from waste facility located in Newhaven East Sussex - . It is a municipal waste incineration plant. It is based on two boilers supplying steam to one turbine-generator. Exhaust steam is condensed in a Air cooled condenser. The site normally operates at baseload. The auxiliary load is self supplied by the generator prior to export metering. The connection capacity used is the summer one. The power factor used is 0.85 for this CMU.
CMU: NEWH02
Capacity Information:
De-Rated Capacity (Registry) 15.582
Connection/DSR Capacity 17.927