Tongland, Kirkcudbrightshire, DG6 4LT, Scotland
21 Components Hydro DRAX RIVER HYDRO LIMITED
Total Capacity: 91.75 MW
Components: 21
Technologies:
Hydro
Unique CMUs: 6

Secondary Trading Contacts

Contact Information

Component Descriptions

Tongland hydro power station - Unit 1, part of the Galloway hydroelectric scheme

Used by 4 CMUs

Tongland hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Tongland power station is 41.25MVA or 33MW at 0.8PF and each of the 3 identical generating unit components is 11MW.

Used by 2 CMUs

Tongland hydro power station - Unit 2, part of the Galloway hydroelectric scheme

Used by 4 CMUs

Tongland hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Tongland Power Station is 41.25MVA or 33MW at 0.8PF and each of the 3 identical generating unit components are 11MW.

Used by 2 CMUs

Tongland hydro power station - Unit 3, part of the Galloway hydroelectric scheme

Used by 4 CMUs

Tongland hydro power station - Unit 3, part of the Galloway hydroelectric scheme The registered capacity of the Tongland Power Station is 41.25MVA or 33MW at 0.8PF and each of the 3 identical generating unit components are 11MW.

Used by 2 CMUs

Components at this Location

Tongland hydro power station - Unit 1, part of the Galloway hydroelectric scheme
CMU: DX21TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 31.763
Connection/DSR Capacity 34.847
Anticipated Capacity 31.763
CMU: DX22TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 31.628
Connection/DSR Capacity 34.706
Anticipated Capacity 31.628
CMU: DX23TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.096
Connection/DSR Capacity 33
Anticipated Capacity 30.096
CMU: DX24TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.03
Connection/DSR Capacity 33
Anticipated Capacity 30.03
Tongland hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Tongland power station is 41.25MVA or 33MW at 0.8PF and each of the 3 identical generating unit components is 11MW.
CMU: DX19TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 29.586
Connection/DSR Capacity 33
Anticipated Capacity 29.585
CMU: DX20TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.027
Connection/DSR Capacity 33
Anticipated Capacity 30.027
Tongland hydro power station - Unit 2, part of the Galloway hydroelectric scheme
CMU: DX21TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 31.763
Connection/DSR Capacity 34.847
Anticipated Capacity 31.763
CMU: DX22TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 31.628
Connection/DSR Capacity 34.706
Anticipated Capacity 31.628
CMU: DX23TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.096
Connection/DSR Capacity 33
Anticipated Capacity 30.096
CMU: DX24TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.03
Connection/DSR Capacity 33
Anticipated Capacity 30.03
Tongland hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Tongland Power Station is 41.25MVA or 33MW at 0.8PF and each of the 3 identical generating unit components are 11MW.
CMU: DX19TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 29.586
Connection/DSR Capacity 33
Anticipated Capacity 29.585
CMU: DX20TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.027
Connection/DSR Capacity 33
Anticipated Capacity 30.027
Tongland hydro power station - Unit 3, part of the Galloway hydroelectric scheme
CMU: DX21TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 31.763
Connection/DSR Capacity 34.847
Anticipated Capacity 31.763
CMU: DX22TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 31.628
Connection/DSR Capacity 34.706
Anticipated Capacity 31.628
CMU: DX23TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.096
Connection/DSR Capacity 33
Anticipated Capacity 30.096
CMU: DX24TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.03
Connection/DSR Capacity 33
Anticipated Capacity 30.03
Tongland hydro power station - Unit 3, part of the Galloway hydroelectric scheme The registered capacity of the Tongland Power Station is 41.25MVA or 33MW at 0.8PF and each of the 3 identical generating unit components are 11MW.
CMU: DX19TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 29.586
Connection/DSR Capacity 33
Anticipated Capacity 29.585
CMU: DX20TO
Hydro DRAX RIVER HYDRO LIMITED Parent: Drax Hydro Limited
Capacity Information:
De-Rated Capacity (Registry) 30.027
Connection/DSR Capacity 33
Anticipated Capacity 30.027