Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW
1 Component Storage (Duration 1h) BESS Claredown Limited
Total Capacity: N/A
Components: 1
Technologies:
Storage (Duration 1h)
Unique CMUs: 1

Secondary Trading Contacts

Contact Information

Component Descriptions

3 MW battery to be installed on the same site as an existing CMU however with a new grid connection and metered separately

Used by 1 CMU

CMU Identifiers

Components at this Location

3 MW battery to be installed on the same site as an existing CMU however with a new grid connection and metered separately
CMU: NBCLD2
Storage (Duration 1h) BESS Claredown Limited Parent: BESS Holdco 4 Limited
Capacity Information:
De-Rated Capacity (Registry) 0.882
Connection/DSR Capacity 3
Anticipated Capacity 0.882