Home List View Map View Technologies Companies Support Us Help Login Register
Theme
Plot C Land at Severn Road Avonmouth BS10 7SE
4 Components Storage (Duration 1h) Willington Power Limited
Total Capacity: N/A
Components: 4
Technologies:
Storage (Duration 1h)
Unique CMUs: 1

Secondary Trading Contacts

Contact Information

Component Descriptions

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. The connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.

Used by 1 CMU

CMU Identifiers

Components at this Location

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. The connection is to be provided at 33KV by installing an underground cable with a metering circuit breaker located at the customer's site.