Search Map View Statistics Support Us Help Login Register
Gateway Crescent, Oldham Broadway Park, Oldham, Lancashire OL9 9XB
1 Component Storage (Duration 1h) FIELD OLDHAM LTD
Total Capacity: N/A
Components: 1
Technologies:
Storage (Duration 1h)
Unique CMUs: 1

Secondary Trading Contacts

Contact Information

Component Descriptions

The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system (NOT containerised). The MV transformers and Power Conversion Systems (Inverters) will be installed in ISO containers positioned outside the warehouse in the yard area.

Used by 1 CMU

CMU Identifiers

Components at this Location

The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system (NOT containerised). The MV transformers and Power Conversion Systems (Inverters) will be installed in ISO containers positioned outside the warehouse in the yard area.
CMU: 22OLD1
Storage (Duration 1h) FIELD OLDHAM LTD Parent: Virmati Energy Ltd
Capacity Information:
De-Rated Capacity (Registry) 3.72
Connection/DSR Capacity 20
Anticipated Capacity 3.72