Search Map View Statistics Support Us Help Login Register
EcoPark, Advent Way, Edmonton, London N18 3AG
10 Components Coal/biomass Energy from Waste LONDONENERGY LTD
Total Capacity: 17.61 MW
Components: 10
Technologies:
Coal/biomass, Energy from Waste
Unique CMUs: 5

Secondary Trading Contacts

Contact Information

Component Descriptions

Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines.

Used by 5 CMUs

Components at this Location

Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines.
CMU: LEL_18
Energy from Waste LONDONENERGY LTD Parent: North London Waste Authority
Capacity Information:
De-Rated Capacity (Registry) 32.565
Connection/DSR Capacity 37.621
Anticipated Capacity 32.565
CMU: LEL_19
Energy from Waste LONDONENERGY LTD Parent: North London Waste Authority
Capacity Information:
De-Rated Capacity (Registry) 32.44
Connection/DSR Capacity 37.805
Anticipated Capacity 32.44
CMU: LEL_20
Energy from Waste LONDONENERGY LTD Parent: North London Waste Authority
Capacity Information:
De-Rated Capacity (Registry) 31.395
Connection/DSR Capacity 37.022
Anticipated Capacity 31.395
CMU: LWL100
Capacity Information:
De-Rated Capacity (Registry) 33.446
Connection/DSR Capacity 38.479
CMU: LWL_17
Coal/biomass LONDONENERGY LTD Parent: North London Waste Authority
Capacity Information:
De-Rated Capacity (Registry) 33.702
Connection/DSR Capacity 38.481
Anticipated Capacity 33.702