Home List View Map View Technologies Companies Support Us Help Login Register
Theme
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, ML2 0EF
4 Components Storage (Duration 2h) Zenobe Wishaw Limited
Total Capacity: N/A
Components: 4
Technologies:
Storage (Duration 2h)
Unique CMUs: 3

Secondary Trading Contacts

Contact Information

Component Descriptions

49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.

Used by 1 CMU

49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.

Used by 1 CMU

49.9MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.

Used by 1 CMU

Components at this Location

49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
CMU: NBWSH3
Storage (Duration 2h) Zenobe Wishaw Limited Parent: BESS HOLDCO 2 LIMITED
Capacity Information:
De-Rated Capacity (Registry) 11.324
Connection/DSR Capacity 49.95
Anticipated Capacity 11.324
49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
CMU: NBWSH2
Storage (Duration 2h) Zenobe Wishaw Limited Parent: BESS HOLDCO 2 LIMITED
Capacity Information:
De-Rated Capacity (Registry) 18.491
Connection/DSR Capacity 49.95
Anticipated Capacity 18.491
49.9MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly to Transmission network.
CMU: NBWSH1
Storage (Duration 2h) Zenobe Wishaw Limited Parent: BESS HOLDCO 2 LIMITED
Capacity Information:
De-Rated Capacity (Registry) 19.846
Connection/DSR Capacity 49.95
Anticipated Capacity 19.845