Search Map View Statistics Support Us Help Login Register
Land at Weirs Drove, Cambridge, CB25 0BP
5 Components Storage (Duration 1h) CARE POWER (BURWELL 1) LIMITED
Total Capacity: N/A
Components: 5
Technologies:
Storage (Duration 1h)
Unique CMUs: 3

Secondary Trading Contacts

Component Descriptions

49.900MW/49.900MWh battery storage asset, 1 hour duration

Used by 2 CMUs

The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.900MW each.

Used by 1 CMU

Components at this Location

49.900MW/49.900MWh battery storage asset, 1 hour duration
CMU: BURWB1
Storage (Duration 1h) CARE POWER (BURWELL 1) LIMITED Parent: SMS Energy Services Limited
Capacity Information:
De-Rated Capacity (Registry) 9.96
Connection/DSR Capacity 49.9
Anticipated Capacity 9.96
CMU: BURWE1
Storage (Duration 1h) CARE POWER (BURWELL 1) LIMITED Parent: SMS Energy Services Limited
Capacity Information:
De-Rated Capacity (Registry) 5.558
Connection/DSR Capacity 49.013
Anticipated Capacity 5.659
The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.900MW each.
CMU: BURWEL
Storage (Duration 1h) East Anglia Grid Storage One Limited Parent: Aura Power Storage Solutions Ltd
Capacity Information:
De-Rated Capacity (Registry) 14.671
Connection/DSR Capacity 49.9
Anticipated Capacity 14.671