Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE - 4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs

Component ID: NBPIN2
Last updated: 18 Jul 2025 18:38 UTC

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 4.65 MW
  • De-Rated Capacity (CMU Registry) 18.60
  • Connection Capacity (CMU Registry) 100 MW
  • Anticipated Capacity (CMU Registry) 18.60 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name Zenobe Capenhurst Limited
  • Parent Company (CMU Registry) BESS HOLDCO 2 LIMITED
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +442039127853

Field Value
_id 585888
Type T-1
rank 0.0573088
CMU ID NBPIN2
Auction Name 2023-24 (T-1) One Year Ahead Capacity Auction
Component ID PINFB-1
Delivery Year 2023
De-Rated Capacity 4.65
OS Grid Reference SJ 371 747
Proven DSR Capacity (empty)
Location and Post Code Land South of NG Capenhurst Substation, Capenhurst Lane, Capenhurst, Cheshire, CH1 6HE
Connection / DSR Capacity 25
Primary Fuel of Component (empty)
Generating Technology Class Storage (Duration 1h)
Description of CMU Components 4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Post-Refurbishing De-Rated Capacity (empty)
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 9220
Type T-1
CMU ID NBPIN2
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2023-24 (T-1) One Year Ahead Capacity Auction
CM Unit Name Capenhurst
CM Unit Type CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2023
Opt Out Status Opt-In
Opt-Out Reason (empty)
Parent Company BESS HOLDCO 2 LIMITED
DSR Test Method (empty)
Is FCM required (empty)
CM Unit Category New Build Generating CMU
Storage Facility Yes
De-Rated Capacity 18.6
Name of Applicant Zenobe Capenhurst Limited
Primary Fuel Type Storage - Battery
Registered Holder Zenobe Capenhurst Limited
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate Β£5000.00 /MW
Termination Fee 2 Rate Β£25000.00 /MW
Termination Fee 3 Rate Β£10000.00 /MW
Termination Fee 4 Rate Β£15000.00 /MW
Termination Fee 5 Rate Β£35000.00 /MW
Connection / DSR Capacity 100
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Transmission
Unique Agreement Identifier CAN-2023-NBPIN2-001
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 18.6
Term of the Capacity Agreement 1
Nature of the Security Interest 1.A fixed charge over specified assets of the company and a floating charge over all of the assets and undertaking of the company
CMU confirmed entry into Auction Yes
Is Connection Agreement required (empty)
Pre-Refurbishment Bidding Status (empty)
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2023-03-24
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 18.6
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone '+442039127853
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid 2023/2024
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved 2022-11-30
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved 2022-10-01
Is copy of Grid Connection Agreement required (empty)
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest 1.Santander UK plc
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement (empty)