None - 3x CAT G3520CPKG. Houghton Main 1 - CMM Generation Plant - Park Spring Road - Little Houghton - S72 7BT. Auxiliary load subtracted prior to the metering point.

Component ID: 4RPPR2
Last updated: 18 Jul 2025 09:16 UTC

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 4.29 MW
  • De-Rated Capacity (CMU Registry) 4.29
  • Connection Capacity (CMU Registry) 4.58 MW
  • Anticipated Capacity (CMU Registry) 4.02 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name Alkane Energy Limited
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) N/A

Field Value
_id 626482
Type T-4
rank 0.0706241
CMU ID 4RPPR2
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
Component ID 4RPPR2
Delivery Year 2018
De-Rated Capacity 4.29
OS Grid Reference (empty)
Proven DSR Capacity (empty)
Location and Post Code (empty)
Connection / DSR Capacity 4.58
Primary Fuel of Component (empty)
Generating Technology Class (empty)
Description of CMU Components 3x CAT G3520CPKG. Houghton Main 1 - CMM Generation Plant - Park Spring Road - Little Houghton - S72 7BT. Auxiliary load subtracted prior to the metering point.
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Post-Refurbishing De-Rated Capacity (empty)
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 1787
Type T-4
CMU ID 4RPPR2
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Houghton Main 1
CM Unit Type Non CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2018
Opt Out Status Opt-In
Opt-Out Reason N/A (Opt-in)
Parent Company (empty)
DSR Test Method (empty)
Is FCM required
CM Unit Category Existing Generating CMU
Storage Facility (empty)
De-Rated Capacity 4.29
Name of Applicant Alkane Energy Limited
Primary Fuel Type (empty)
Registered Holder Alkane Energy Limited
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate Β£5,000/MW
Termination Fee 2 Rate Β£25,000/MW
Termination Fee 3 Rate (empty)
Termination Fee 4 Rate (empty)
Termination Fee 5 Rate (empty)
Connection / DSR Capacity 4.58
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary 01/10/2018 - 03/01/2019 = 4.290 MW; 04/01/2019 - 30/09/2019 = 2.290 MW
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2018-4RPPR2-00001
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 4.015869
Term of the Capacity Agreement 1
Nature of the Security Interest (empty)
CMU confirmed entry into Auction Yes
Is Connection Agreement required
Pre-Refurbishment Bidding Status N/A
Secondary Trading Contact - Email (empty)
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2015-01-30
List of Traded Capacity Obligations T1: -2.000 MW
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 4.29
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies T1: 04/01/2019 - 30/09/2019
Secondary Trading Contact - Telephone (empty)
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid 2018/2019
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest (empty)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement (empty)