Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto

None - Winnington CHP is an unlicensed (100 MW export limit) non-CMRS Refurbishing Generating CMU which provides heat and power to various adjoining manufacturing sites via pipeline and a large private wire system (Associated Load). It is located in Northwich, Cheshire and consists of three generating units: 1 gas turbine (GT) and 1 steam turbine (ST) (CHP Technology Class) and 1 gas turbine (OCGT technology class). The original configuration of the CHP is 2 x GT 39.97 MW each, both feeding into separate Heat Recovery Boilers, and 1 x ST 58.12 MW (Unit Registered Capacity). These are calculated values from the Distribution Connection and Use of System Agreement values given as: each GT 47.024 MVA, ST 68.38 MVA and using a power factor of 0.85 (also from Connection Agreement). Due to recent (Feb 2014) permanent operational changes resulting in a significant reduction in steam demand from the CHP Plant, the 58.12 MW steam turbine can no longer be operated. Winnington CHP Ltd is therefore applying as a refurbishing CMU as the old ST is being replaced by a new, correctly sized ST (14.63 MW) to be commissioned in September 2015. The new steam turbine has been ordered and approximately £1.3m of the £5.5m project cost has been incurred already. As a consequence, the refurbishment is a capacity reduction. The CHP Plant parasitic load is 3 MW and the CHP supplies on average 13.74 MW to four other users at two different locations in Northwich (Winnington and Lostock) by private wire (Tata Chemicals Europe Ltd (TCE) Winnington: 3.33 MW, TCE Lostock: 5.53 MW, Ineos Winnington: 0.47 MW, Ineos Lostock: 4.41 MW). The calculation methods used for the Available Capacity of each generating unit are based on Rule 3.5.2(c)(iii)(bb) for the new ST and Rule 3.5.2(c)(i) for both GT’s. The parasitic and associated loads were prorated and assigned to each generating unit without weighting to obtain the Available Capacity of each unit. The Anticipated De-rated Capacity of the CMU is 71.25 MW. Winnington CHP exports to the Distribution system via a single MPAN, at 132KV. The connection agreement permits an export in excess of the Anticipated De-rated capacity of the refurbished CMU.

Component ID: 2015_1
Last updated: 17 Jul 2025 21:11 UTC

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 0 MW
  • De-Rated Capacity (CMU Registry) 43.40
  • Connection Capacity (CMU Registry) 50 MW
  • Anticipated Capacity (CMU Registry) N/A

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name TATA STEEL UK LIMITED
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) +4402077174412

Field Value
_id 626961
Type T-4
rank 0.000000000000000444089
CMU ID WNCHP1
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
Component ID WNCHP1
Delivery Year 2018
De-Rated Capacity (empty)
OS Grid Reference (empty)
Proven DSR Capacity (empty)
Location and Post Code (empty)
Connection / DSR Capacity 77
Primary Fuel of Component (empty)
Generating Technology Class (empty)
Description of CMU Components Winnington CHP is an unlicensed (100 MW export limit) non-CMRS Refurbishing Generating CMU which provides heat and power to various adjoining manufacturing sites via pipeline and a large private wire system (Associated Load). It is located in Northwich, Cheshire and consists of three generating units: 1 gas turbine (GT) and 1 steam turbine (ST) (CHP Technology Class) and 1 gas turbine (OCGT technology class). The original configuration of the CHP is 2 x GT 39.97 MW each, both feeding into separate Heat Recovery Boilers, and 1 x ST 58.12 MW (Unit Registered Capacity). These are calculated values from the Distribution Connection and Use of System Agreement values given as: each GT 47.024 MVA, ST 68.38 MVA and using a power factor of 0.85 (also from Connection Agreement). Due to recent (Feb 2014) permanent operational changes resulting in a significant reduction in steam demand from the CHP Plant, the 58.12 MW steam turbine can no longer be operated. Winnington CHP Ltd is therefore applying as a refurbishing CMU as the old ST is being replaced by a new, correctly sized ST (14.63 MW) to be commissioned in September 2015. The new steam turbine has been ordered and approximately £1.3m of the £5.5m project cost has been incurred already. As a consequence, the refurbishment is a capacity reduction. The CHP Plant parasitic load is 3 MW and the CHP supplies on average 13.74 MW to four other users at two different locations in Northwich (Winnington and Lostock) by private wire (Tata Chemicals Europe Ltd (TCE) Winnington: 3.33 MW, TCE Lostock: 5.53 MW, Ineos Winnington: 0.47 MW, Ineos Lostock: 4.41 MW). The calculation methods used for the Available Capacity of each generating unit are based on Rule 3.5.2(c)(iii)(bb) for the new ST and Rule 3.5.2(c)(i) for both GT’s. The parasitic and associated loads were prorated and assigned to each generating unit without weighting to obtain the Available Capacity of each unit. The Anticipated De-rated Capacity of the CMU is 71.25 MW. Winnington CHP exports to the Distribution system via a single MPAN, at 132KV. The connection agreement permits an export in excess of the Anticipated De-rated capacity of the refurbished CMU.
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity 71.244
Post-Refurbishing De-Rated Capacity 71.244
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 1
Type TR
CMU ID 2015_1
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2016-17 (TR) Transitional Capacity Auction
CM Unit Name Strip_15
CM Unit Type Non CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2016
Opt Out Status Opt-In
Opt-Out Reason (empty)
Parent Company (empty)
DSR Test Method (empty)
Is FCM required (empty)
CM Unit Category Unproven DSR CMU
Storage Facility No
De-Rated Capacity 43.4
Name of Applicant TATA STEEL UK LIMITED
Primary Fuel Type (empty)
Registered Holder (empty)
Annual Penalty Cap (empty)
Monthly Penalty Cap (empty)
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover 21700
Termination Fee 1 Rate (empty)
Termination Fee 2 Rate (empty)
Termination Fee 3 Rate (empty)
Termination Fee 4 Rate (empty)
Termination Fee 5 Rate (empty)
Connection / DSR Capacity 50
Maximum Obligation Period 1
Capacity Agreement Awarded (empty)
Pre-Qualification Decision Not Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Distribution
Unique Agreement Identifier (empty)
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity (empty)
Term of the Capacity Agreement (empty)
Nature of the Security Interest (empty)
CMU confirmed entry into Auction (empty)
Is Connection Agreement required (empty)
Pre-Refurbishment Bidding Status (empty)
Secondary Trading Contact - Email (empty)
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement (empty)
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation (empty)
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone '+4402077174412
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded (empty)
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid (empty)
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required (empty)
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest (empty)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round (empty)
Long-Stop Date for the Minimum Completion Requirement (empty)