EMR Leeds (Knowsthorpe Way), 25 Knowsthorpe Way, Cross Green Ind Est, Leeds, LS9 0SW - The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Component ID: DR2406
Last updated: 20 Sep 2025 06:35 UTC
CMU ID:
Technology:
Description:
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Auction:
2024-25 (T-1) One Year Ahead Capacity Auction

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 7.01 MW
  • De-Rated Capacity (CMU Registry) 11.22
  • Connection Capacity (CMU Registry) 14.20 MW
  • Anticipated Capacity (CMU Registry) 11.22 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name ENEL X UK LIMITED
  • Parent Company (CMU Registry) ENEL X INTERNATIONAL S.R.L.
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4402037954936

Field Value
_id 376089
Type ST
rank 0.0000797658
CMU ID DR2406
Auction Name 2024-25 (T-1) One Year Ahead Capacity Auction
Component ID EMRX32
Delivery Year 2024
De-Rated Capacity (empty)
OS Grid Reference SE 328 316
Location and Post Code EMR Leeds (Knowsthorpe Way), 25 Knowsthorpe Way, Cross Green Ind Est, Leeds, LS9 0SW
Connection / DSR Capacity (empty)
Primary Fuel of Component (empty)
Generating Technology Class DSR
Description of CMU Components The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Permitted on-Site Generating Unit No
Pre-Refurbishing De-Rated Capacity (empty)
Post-Refurbishing De-Rated Capacity (empty)
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 10549
Type ST
CMU ID DR2406
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2024-25 (T-1) One Year Ahead Capacity Auction
CM Unit Name DSRX87
CM Unit Type Non CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2024
Opt Out Status Opt-In
Opt-Out Reason (empty)
Parent Company ENEL X INTERNATIONAL S.R.L.
DSR Test Method (empty)
Is FCM required (empty)
CM Unit Category Proven DSR CMU
Storage Facility No
De-Rated Capacity 11.222
Name of Applicant ENEL X UK LIMITED
Primary Fuel Type DSR
Registered Holder ENEL X UK LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity 14.198
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate Β£5000.00 /MW
Termination Fee 2 Rate Β£25000.00 /MW
Termination Fee 3 Rate Β£10000.00 /MW
Termination Fee 4 Rate Β£15000.00 /MW
Termination Fee 5 Rate Β£35000.00 /MW
Connection / DSR Capacity 14.198
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary 01/10/2024 - 30/09/2025:11.222 MW
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2024-DR2406-001
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 11.219
Term of the Capacity Agreement 1
Nature of the Security Interest (empty)
CMU confirmed entry into Auction (empty)
Is Connection Agreement required (empty)
Pre-Refurbishment Bidding Status (empty)
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2024-08-27
List of Traded Capacity Obligations T1: 9.778 MW; T2: 1.444 MW
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation (empty)
Date of Issue of DSR Test Certificate 2023-08-31
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies T1: 01/10/2024 - 30/09/2025; T2: 01/10/2024 - 30/09/2025
Secondary Trading Contact - Telephone '+4402037954936
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid 2024/2025
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required (empty)
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest (empty)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round (empty)
Long-Stop Date for the Minimum Completion Requirement (empty)