None - Address: Cottam EDF Energy (Cottam Power) Ltd - Outgang Lane - Cottam - Retford - DN22 0NP Description: T_COTPS-3 + (25% * T_COTPS-S) The other 75% of station auxilary load from T_COTPS-S is allocated evenly to COTPS1 - COTPS2 and COTPS4. See prequalification pack for more detail if required. For the avoidance of doubt: MSID 5004 is also used for COTPS4 MSID 5005 is also used for COTPS1 - COTPS2 and COTPS4

Component ID: COTPS1
Last updated: 17 Jul 2025 08:51 UTC

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 0 MW
  • De-Rated Capacity (CMU Registry) 0
  • Connection Capacity (CMU Registry) 497 MW
  • Anticipated Capacity (CMU Registry) 0 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name EDF Energy Limited
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) N/A

Field Value
_id 626540
Type T-4
rank 0.0706241
CMU ID COTPS3
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
Component ID COTPS3
Delivery Year 2018
De-Rated Capacity (empty)
OS Grid Reference (empty)
Proven DSR Capacity (empty)
Location and Post Code (empty)
Connection / DSR Capacity 507
Primary Fuel of Component (empty)
Generating Technology Class (empty)
Description of CMU Components Address: Cottam EDF Energy (Cottam Power) Ltd - Outgang Lane - Cottam - Retford - DN22 0NP Description: T_COTPS-3 + (25% * T_COTPS-S) The other 75% of station auxilary load from T_COTPS-S is allocated evenly to COTPS1 - COTPS2 and COTPS4. See prequalification pack for more detail if required. For the avoidance of doubt: MSID 5004 is also used for COTPS4 MSID 5005 is also used for COTPS1 - COTPS2 and COTPS4
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity 444.335
Post-Refurbishing De-Rated Capacity 444.335
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 1854
Type T-4
CMU ID COTPS1
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Cottam Power Station CMU 1
CM Unit Type CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2018
Opt Out Status Opt-In
Opt-Out Reason N/A (Opt-in)
Parent Company (empty)
DSR Test Method (empty)
Is FCM required Yes
CM Unit Category Refurbishing CMU
Storage Facility (empty)
De-Rated Capacity (empty)
Name of Applicant EDF Energy Limited
Primary Fuel Type (empty)
Registered Holder EDF Energy Limited
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate Β£5,000/MW
Termination Fee 2 Rate Β£25,000/MW
Termination Fee 3 Rate (empty)
Termination Fee 4 Rate (empty)
Termination Fee 5 Rate (empty)
Connection / DSR Capacity 497
Maximum Obligation Period 3
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status Refurbishing and Existing CM Unit
Transmission / Distribution Transmission
Unique Agreement Identifier CAN-2018-COTPS1-00001
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity (empty)
Term of the Capacity Agreement 1
Nature of the Security Interest (empty)
CMU confirmed entry into Auction Yes
Is Connection Agreement required
Pre-Refurbishment Bidding Status Refurbishing and Existing CM Unit
Secondary Trading Contact - Email (empty)
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity 435.571
Date of Issue of Capacity Agreement 2015-01-30
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity 435.571
Auction Acquired Capacity Obligation 435.571
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone (empty)
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded 3
Date for Financial Commitment Milestone 2016-07-02
Delivery Years for which Agreement Valid 2018/2019
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required
Anticipated Pre-Refurbishing De-Rated Capacity 435.5708
Anticipated Post-Refurbishing De-Rated Capacity 435.5708
Legal Name of any Person with a Security Interest (empty)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round 3
Long-Stop Date for the Minimum Completion Requirement (empty)