Home Technologies Companies Locations Map Explorer FAQ Trading Board Buy Me A Coffee Help Login Register
Theme
Light Dark Auto

None - This CMU component is a boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC. The metering for this unit is an aggregation of GEN6 and UT6.The net output of the CMU component will be the metered output for T_DRAXX-6 less the auxiliary load. Drax Power Station, Selby, North Yorkshire, YO8 8PH 667267

Component ID: DRAX06
Last updated: 21 Jul 2025 18:34 UTC

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 561.79 MW
  • De-Rated Capacity (CMU Registry) 561.79
  • Connection Capacity (CMU Registry) 639.41 MW
  • Anticipated Capacity (CMU Registry) 561.79 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name Drax Power Limited
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) N/A

Field Value
_id 577988
Type T-4
rank 0.0706241
CMU ID DRAX06
Auction Name 2019-20 (T-4) Four Year Ahead Capacity Auction
Component ID DRAX06
Delivery Year 2019
De-Rated Capacity 561.789
OS Grid Reference (empty)
Proven DSR Capacity (empty)
Location and Post Code (empty)
Connection / DSR Capacity 639.414
Primary Fuel of Component (empty)
Generating Technology Class (empty)
Description of CMU Components This CMU component is a boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC. The metering for this unit is an aggregation of GEN6 and UT6.The net output of the CMU component will be the metered output for T_DRAXX-6 less the auxiliary load. Drax Power Station, Selby, North Yorkshire, YO8 8PH 667267
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Post-Refurbishing De-Rated Capacity (empty)
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 2873
Type T-4
CMU ID DRAX06
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2019-20 (T-4) Four Year Ahead Capacity Auction
CM Unit Name DRAX06
CM Unit Type CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2019
Opt Out Status Opt-In
Opt-Out Reason N/A
Parent Company (empty)
DSR Test Method (empty)
Is FCM required (empty)
CM Unit Category Existing Generating CMU
Storage Facility (empty)
De-Rated Capacity 561.789
Name of Applicant Drax Power Limited
Primary Fuel Type (empty)
Registered Holder Drax Power Limited
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate Β£5,000/MW
Termination Fee 2 Rate Β£25,000/MW
Termination Fee 3 Rate (empty)
Termination Fee 4 Rate (empty)
Termination Fee 5 Rate (empty)
Connection / DSR Capacity 639.414
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Transmission
Unique Agreement Identifier CAN-A-T-4-2019-DRAX06-00001
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 561.789
Term of the Capacity Agreement 1
Nature of the Security Interest (empty)
CMU confirmed entry into Auction N/A
Is Connection Agreement required (empty)
Pre-Refurbishment Bidding Status (empty)
Secondary Trading Contact - Email (empty)
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2016-01-13
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 561.789
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone (empty)
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid 2019/2020
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required (empty)
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest (empty)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement (empty)