None - Location Centrica Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station located on Eastern Wood Road on the outskirts of Plympton Devon at national grid reference SX 568 558. Plant Langage Energy Centre operates 2 Gas Turbines and one Steam Turbine in a combined cycle design comprising: 2 Alstom GT26B2.2 Gas Turbines with electrical generators (19KV); 2 Alstom Heat Recovery Steam Generators (HRSG); One Steam Turbine with electrical generator (21KV); One Air Cooled Condenser; Offsite gas Above Ground Installation (AGI) and 2.6km of gas pipeline owned and operated by Langage Energy Centre; 3 Step up Transformers (19/21KV – 400KV); and Connection to the 400KV volt electrical distribution system owned by National Grid though the Gas Insulated Substation. Metering Electrical Generation is MVRNd to the BRITGAS trading account. Site Works Power is netted off Total Generation to leave the balance as net export to the National Grid.

Component ID: TLAGA0
Last updated: 17 Jul 2025 08:59 UTC

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 796.40 MW
  • De-Rated Capacity (CMU Registry) 796.40
  • Connection Capacity (CMU Registry) 905 MW
  • Anticipated Capacity (CMU Registry) 796.40 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name EP Langage Limited
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) N/A

Field Value
_id 577786
Type T-4
rank 0.0706241
CMU ID TLAGA0
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
Component ID TLAGA0
Delivery Year 2018
De-Rated Capacity 796.4
OS Grid Reference (empty)
Proven DSR Capacity (empty)
Location and Post Code (empty)
Connection / DSR Capacity 905
Primary Fuel of Component (empty)
Generating Technology Class (empty)
Description of CMU Components Location Centrica Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station located on Eastern Wood Road on the outskirts of Plympton Devon at national grid reference SX 568 558. Plant Langage Energy Centre operates 2 Gas Turbines and one Steam Turbine in a combined cycle design comprising: 2 Alstom GT26B2.2 Gas Turbines with electrical generators (19KV); 2 Alstom Heat Recovery Steam Generators (HRSG); One Steam Turbine with electrical generator (21KV); One Air Cooled Condenser; Offsite gas Above Ground Installation (AGI) and 2.6km of gas pipeline owned and operated by Langage Energy Centre; 3 Step up Transformers (19/21KV – 400KV); and Connection to the 400KV volt electrical distribution system owned by National Grid though the Gas Insulated Substation. Metering Electrical Generation is MVRNd to the BRITGAS trading account. Site Works Power is netted off Total Generation to leave the balance as net export to the National Grid.
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity 0
Post-Refurbishing De-Rated Capacity 0
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 2155
Type T-4
CMU ID TLAGA0
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
CM Unit Name T_LAGA-1
CM Unit Type CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2018
Opt Out Status Opt-In
Opt-Out Reason N/A (Opt-in)
Parent Company (empty)
DSR Test Method (empty)
Is FCM required
CM Unit Category Existing Generating CMU
Storage Facility (empty)
De-Rated Capacity 796.4
Name of Applicant EP Langage Limited
Primary Fuel Type (empty)
Registered Holder EP Langage Limited
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5,000/MW
Termination Fee 2 Rate £25,000/MW
Termination Fee 3 Rate (empty)
Termination Fee 4 Rate (empty)
Termination Fee 5 Rate (empty)
Connection / DSR Capacity 905
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Transmission
Unique Agreement Identifier CAN-2018-TLAGA0-00001
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 796.4
Term of the Capacity Agreement 1
Nature of the Security Interest First fixed charge over all rights in respect of the Capacity Agreement
CMU confirmed entry into Auction Yes
Is Connection Agreement required
Pre-Refurbishment Bidding Status N/A
Secondary Trading Contact - Email (empty)
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2015-01-30
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 796.4
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone (empty)
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid 2018/2019
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest Lloyds Bank PLC
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement (empty)