Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu

None - Additional capacity alongside the long term STOR at AlcoaB. Auxiliary load is fed from before the metering and is therefore taken into account when delivering. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. The Financial Milestone has been completed. The site consists of multiple generators, each either operating under STOR or providing capacity to the CM, with none providing both. Settlement metering at the site boundary will be apportioned via individual generator metering and split according to the generation type (STOR/CM). CM data only will be supplied when required. Address update July 2017: Titanium Road, Waunarlwydd, Swansea, SA5 4SG Grid reference: SS 606 963

Component ID: PP1107
Last updated: 24 Aug 2025 11:59 UTC

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 5.61 MW
  • De-Rated Capacity (CMU Registry) 5.61
  • Connection Capacity (CMU Registry) 6 MW
  • Anticipated Capacity (CMU Registry) 5.62 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name Viridis 178 Limited
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) N/A

Field Value
_id 577691
Type T-4
rank 0.0706241
CMU ID PP1107
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
Component ID PP1107
Delivery Year 2018
De-Rated Capacity 5.61
OS Grid Reference (empty)
Proven DSR Capacity (empty)
Location and Post Code (empty)
Connection / DSR Capacity 6
Primary Fuel of Component (empty)
Generating Technology Class (empty)
Description of CMU Components Additional capacity alongside the long term STOR at AlcoaB. Auxiliary load is fed from before the metering and is therefore taken into account when delivering. The site generates at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. The Financial Milestone has been completed. The site consists of multiple generators, each either operating under STOR or providing capacity to the CM, with none providing both. Settlement metering at the site boundary will be apportioned via individual generator metering and split according to the generation type (STOR/CM). CM data only will be supplied when required. Address update July 2017: Titanium Road, Waunarlwydd, Swansea, SA5 4SG Grid reference: SS 606 963
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity 0
Post-Refurbishing De-Rated Capacity 0
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 2083
Type T-4
CMU ID PP1107
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
CM Unit Name AlcoaB - 1
CM Unit Type CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2018
Opt Out Status Opt-In
Opt-Out Reason N/A (Opt-in)
Parent Company (empty)
DSR Test Method (empty)
Is FCM required
CM Unit Category New Build Generating CMU
Storage Facility (empty)
De-Rated Capacity 5.61
Name of Applicant Viridis 178 Limited
Primary Fuel Type (empty)
Registered Holder Viridis 178 Limited
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate Β£5,000/MW
Termination Fee 2 Rate Β£25,000/MW
Termination Fee 3 Rate (empty)
Termination Fee 4 Rate (empty)
Termination Fee 5 Rate (empty)
Connection / DSR Capacity 6
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2018-PP1107-00001
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 5.6166
Term of the Capacity Agreement 1
Nature of the Security Interest An assignment by way of security under the Capacity Agreement pursuant to a debenture dated 12 April 2018 between the Registered Holder and the Security Interest Beneficiary
CMU confirmed entry into Auction Yes
Is Connection Agreement required
Pre-Refurbishment Bidding Status N/A
Secondary Trading Contact - Email (empty)
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2015-01-30
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 5.509
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone (empty)
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid 2018/2019
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest Lloyds Bank PLC
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement (empty)