None - Location Kings Lynn Power Station prospective new build project is located on the southern outskirts of King’s Lynn in Willows Business Park PE34 3RD (ordnance survey grid reference X: 560800 Y: 317100). This site is located on the eastern bank of the River Great Ouse with the land surrounding the power station is predominantly agricultural being used for arable cropping and the site is located on a relatively flat area. Prospective Plant One prospective Combined Cycle design comprising: One new Gas Turbine, utilising the existing but overhauled and enhanced electrical generator; One overhauled and performance enhanced steam turbine; One extended air-cooled condenser; Upgraded gas turbine air filtration house and water steam cycle; and Connection to the 132000 volt electrical distribution system will be maintained and the export capacity both to the DNO through the existing BCA (Bilateral Connection Agreement) and to National Grid Electricity Transmission through a BEGA (Bilateral Embedded Generation Agreement) and TEC (Technical Entry Capacity) reservation are already in place. Connection to the gas national transmission system is already in place and a network exit agreement (NExA) secured with National Grid gas. Metering Electrical Generation is MVRNd to the BRITGAS trading account. Site Works Power is netted off Total Generation to leave the balance as ‘net export’ to the National Grid.

Component ID: KLYNA0
Last updated: 05 Aug 2025 02:05 UTC

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 325.60 MW
  • De-Rated Capacity (CMU Registry) 325.60
  • Connection Capacity (CMU Registry) 370 MW
  • Anticipated Capacity (CMU Registry) 325.60 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name Centrica plc
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) N/A

Field Value
_id 577614
Type T-4
rank 0.0706241
CMU ID KLYNA0
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
Component ID KLYNA0
Delivery Year 2018
De-Rated Capacity 325.6
OS Grid Reference (empty)
Proven DSR Capacity (empty)
Location and Post Code (empty)
Connection / DSR Capacity 370
Primary Fuel of Component (empty)
Generating Technology Class (empty)
Description of CMU Components Location Kings Lynn Power Station prospective new build project is located on the southern outskirts of King’s Lynn in Willows Business Park PE34 3RD (ordnance survey grid reference X: 560800 Y: 317100). This site is located on the eastern bank of the River Great Ouse with the land surrounding the power station is predominantly agricultural being used for arable cropping and the site is located on a relatively flat area. Prospective Plant One prospective Combined Cycle design comprising: One new Gas Turbine, utilising the existing but overhauled and enhanced electrical generator; One overhauled and performance enhanced steam turbine; One extended air-cooled condenser; Upgraded gas turbine air filtration house and water steam cycle; and Connection to the 132000 volt electrical distribution system will be maintained and the export capacity both to the DNO through the existing BCA (Bilateral Connection Agreement) and to National Grid Electricity Transmission through a BEGA (Bilateral Embedded Generation Agreement) and TEC (Technical Entry Capacity) reservation are already in place. Connection to the gas national transmission system is already in place and a network exit agreement (NExA) secured with National Grid gas. Metering Electrical Generation is MVRNd to the BRITGAS trading account. Site Works Power is netted off Total Generation to leave the balance as ‘net export’ to the National Grid.
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity 0
Post-Refurbishing De-Rated Capacity 0
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 2024
Type T-4
CMU ID KLYNA0
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
CM Unit Name E_KLYN-A-1
CM Unit Type CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2018
Opt Out Status Opt-In
Opt-Out Reason N/A (Opt-in)
Parent Company (empty)
DSR Test Method (empty)
Is FCM required (empty)
CM Unit Category New Build Generating CMU
Storage Facility (empty)
De-Rated Capacity 325.6
Name of Applicant Centrica plc
Primary Fuel Type (empty)
Registered Holder (empty)
Annual Penalty Cap (empty)
Monthly Penalty Cap (empty)
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate (empty)
Termination Fee 2 Rate (empty)
Termination Fee 3 Rate (empty)
Termination Fee 4 Rate (empty)
Termination Fee 5 Rate (empty)
Connection / DSR Capacity 370
Maximum Obligation Period 15
Capacity Agreement Awarded No
Pre-Qualification Decision Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Distribution
Unique Agreement Identifier (empty)
New Build Yet to Satisfy FCM Yes
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 325.6
Term of the Capacity Agreement (empty)
Nature of the Security Interest (empty)
CMU confirmed entry into Auction Yes
Is Connection Agreement required (empty)
Pre-Refurbishment Bidding Status N/A
Secondary Trading Contact - Email (empty)
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement (empty)
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation (empty)
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone (empty)
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded (empty)
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid (empty)
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required (empty)
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest (empty)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round 15
Long-Stop Date for the Minimum Completion Requirement (empty)