Home List View Map View Technologies Companies Support Us Help Login Register
Theme
Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom Map

General Information

Key Details
  • Description TG1B is part of the aggregated CMU EMD-18, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND BMU' and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD-18' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power and steam generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. There is a project currently in construction phase to install separate metering for the auxiliary power for both TG1B and Unit 3. This will provide half hourly meters for the auxiliary load for the two units, these will be installed in time to pass a Metering Test for the delivery of this Capacity Market (they are planned for completion on 28th September 2018). This was previously agreed with the settlements body as part of an appeal process for the T-4 2018 capacity market auction. In this appeal the capacity market settlements body accepted ExxonMobil's appeal for the auxiliary meters to be installed in time for the capacity market delivery period 2018/19 i.e. 1st October 2018. For now, using the same method as for the T4 -2018 Capacity Market, (with the successful appeal) we have determined the auxiliary load for TG1B to be 2.024 MW (based on the total auxiliary consumption over the three Highest TG1B+Unit 3 Generation points) which represents on average 7.954% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 7.954/3 = 2.6513% of MSID 7096, thus 2.024 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU- i.e. Unit 3). To clarify the 3 units within the refinery boundary, they are Unit 5 (EMG-18) and TG1B and Unit 3 (which make up EMD-18). Unit 5 now has half hourly meters installed on the auxiliary load so the estimate on auxiliary load for now is only for Unit 3 and TG1B. This will move to half hourly metering for Unit 3 and TG1B once the auxiliary load meters are installed by 28th September 2018. Gross 3 HH av. peak generation from TG1B on separate days = 56.634 MW At these three HH times, aux load on TG1B = 2.024 MW Net generation from TG1B = 54.610 MW
  • Auction 2019-20 (T-1) One Year Ahead Capacity Auction
  • Delivery Year 2019
Geocoding Status: No

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 124.60
  • Connection Capacity (CMU Registry) 138.44 MW
  • Anticipated Capacity (CMU Registry) 124.60 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name ESSO PETROLEUM COMPANY,LIMITED
  • Parent Company (CMU Registry) ExxonMobil UK Limited
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4402382477814

Field Value
_id 611521
Type T-1
rank 0.0000000000000001
CMU ID EMD-18
Auction Name 2019-20 (T-1) One Year Ahead Capacity Auction
Component ID EPCMU314-1
Delivery Year 2019
De-Rated Capacity (empty)
OS Grid Reference SU 439 039
Proven DSR Capacity (empty)
Location and Post Code Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom
Connection / DSR Capacity (empty)
Primary Fuel of Component (empty)
Generating Technology Class Combined Heat and Power (CHP)
Description of CMU Components TG1B is part of the aggregated CMU EMD-18, which is made up of 2 Generating Units of which TG1B is the larger. This Generating Unit is embedded in the 'E_FAWND BMU' and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of 'EMD-18' are located within the physical boundaries of the Esso Petroleum Company,Limited Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. TG1B is one of three power and steam generation units on the site and is a Steam Turbine plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (part of MSID 7095). Both Unit 3 and TG1B units share various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. There is a project currently in construction phase to install separate metering for the auxiliary power for both TG1B and Unit 3. This will provide half hourly meters for the auxiliary load for the two units, these will be installed in time to pass a Metering Test for the delivery of this Capacity Market (they are planned for completion on 28th September 2018). This was previously agreed with the settlements body as part of an appeal process for the T-4 2018 capacity market auction. In this appeal the capacity market settlements body accepted ExxonMobil's appeal for the auxiliary meters to be installed in time for the capacity market delivery period 2018/19 i.e. 1st October 2018. For now, using the same method as for the T4 -2018 Capacity Market, (with the successful appeal) we have determined the auxiliary load for TG1B to be 2.024 MW (based on the total auxiliary consumption over the three Highest TG1B+Unit 3 Generation points) which represents on average 7.954% of the total Power Demand as measured at the metering points at MSID 7096. Due to the large amount of common equipment shared by the three generation units we are unable to determine exactly what part of the auxiliary load is directly attributable to TG1B and thus for this CMU we have attributed the auxiliary load evenly about the three units - i.e. 7.954/3 = 2.6513% of MSID 7096, thus 2.024 MW. (NB. the rest of MSID 7095 is made up of one of our other components of our CMU- i.e. Unit 3). To clarify the 3 units within the refinery boundary, they are Unit 5 (EMG-18) and TG1B and Unit 3 (which make up EMD-18). Unit 5 now has half hourly meters installed on the auxiliary load so the estimate on auxiliary load for now is only for Unit 3 and TG1B. This will move to half hourly metering for Unit 3 and TG1B once the auxiliary load meters are installed by 28th September 2018. Gross 3 HH av. peak generation from TG1B on separate days = 56.634 MW At these three HH times, aux load on TG1B = 2.024 MW Net generation from TG1B = 54.610 MW
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Post-Refurbishing De-Rated Capacity (empty)
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 11293
Type T-4
CMU ID EMG-20
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2024-25 (T-4) Four Year Ahead Capacity Auction
CM Unit Name EMG-20
CM Unit Type CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2024
Opt Out Status Opt-In
Opt-Out Reason (empty)
Parent Company ExxonMobil UK Limited
DSR Test Method (empty)
Is FCM required (empty)
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity 124.599
Name of Applicant ESSO PETROLEUM COMPANY,LIMITED
Primary Fuel Type Gas
Registered Holder ESSO PETROLEUM COMPANY,LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 138.443
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2024-EMG-20-001
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 124.599
Term of the Capacity Agreement 1
Nature of the Security Interest (empty)
CMU confirmed entry into Auction Yes
Is Connection Agreement required (empty)
Pre-Refurbishment Bidding Status (empty)
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2021-04-19
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 124.599
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone '+4402382477814
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid 2024/2025
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required (empty)
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest (empty)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement (empty)