N/A Map

General Information

Key Details
  • Description Winnington CHP is an unlicensed (100 MW export limit) non-CMRS Refurbishing Generating CMU which provides heat and power to various adjoining manufacturing sites via pipeline and a large private wire system (Associated Load). It is located in Northwich, Cheshire and consists of three generating units: 1 gas turbine (GT) and 1 steam turbine (ST) (CHP Technology Class) and 1 gas turbine (OCGT technology class). The original configuration of the CHP is 2 x GT 39.97 MW each, both feeding into separate Heat Recovery Boilers, and 1 x ST 58.12 MW (Unit Registered Capacity). These are calculated values from the Distribution Connection and Use of System Agreement values given as: each GT 47.024 MVA, ST 68.38 MVA and using a power factor of 0.85 (also from Connection Agreement). Due to recent (Feb 2014) permanent operational changes resulting in a significant reduction in steam demand from the CHP Plant, the 58.12 MW steam turbine can no longer be operated. Winnington CHP Ltd is therefore applying as a refurbishing CMU as the old ST is being replaced by a new, correctly sized ST (14.63 MW) to be commissioned in September 2015. The new steam turbine has been ordered and approximately £1.3m of the £5.5m project cost has been incurred already. As a consequence, the refurbishment is a capacity reduction. The CHP Plant parasitic load is 3 MW and the CHP supplies on average 13.74 MW to four other users at two different locations in Northwich (Winnington and Lostock) by private wire (Tata Chemicals Europe Ltd (TCE) Winnington: 3.33 MW, TCE Lostock: 5.53 MW, Ineos Winnington: 0.47 MW, Ineos Lostock: 4.41 MW). The calculation methods used for the Available Capacity of each generating unit are based on Rule 3.5.2(c)(iii)(bb) for the new ST and Rule 3.5.2(c)(i) for both GT’s. The parasitic and associated loads were prorated and assigned to each generating unit without weighting to obtain the Available Capacity of each unit. The Anticipated De-rated Capacity of the CMU is 71.25 MW. Winnington CHP exports to the Distribution system via a single MPAN, at 132KV. The connection agreement permits an export in excess of the Anticipated De-rated capacity of the refurbished CMU.
  • Auction 2018-19 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2018
Geocoding Status: Yes

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 0
  • Connection Capacity (CMU Registry) 77 MW
  • Anticipated Capacity (CMU Registry) 0 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name Winnington CHP Limited
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) N/A

Field Value
_id 577830
Type T-4
rank 0.0573088
CMU ID WNCHP1
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
Component ID 5
Delivery Year 2018
De-Rated Capacity
null
OS Grid Reference
null
Proven DSR Capacity
null
Location and Post Code
null
Connection / DSR Capacity
null
Primary Fuel of Component
null
Generating Technology Class
null
Description of CMU Components Winnington CHP is an unlicensed (100 MW export limit) non-CMRS Refurbishing Generating CMU which provides heat and power to various adjoining manufacturing sites via pipeline and a large private wire system (Associated Load). It is located in Northwich, Cheshire and consists of three generating units: 1 gas turbine (GT) and 1 steam turbine (ST) (CHP Technology Class) and 1 gas turbine (OCGT technology class). The original configuration of the CHP is 2 x GT 39.97 MW each, both feeding into separate Heat Recovery Boilers, and 1 x ST 58.12 MW (Unit Registered Capacity). These are calculated values from the Distribution Connection and Use of System Agreement values given as: each GT 47.024 MVA, ST 68.38 MVA and using a power factor of 0.85 (also from Connection Agreement). Due to recent (Feb 2014) permanent operational changes resulting in a significant reduction in steam demand from the CHP Plant, the 58.12 MW steam turbine can no longer be operated. Winnington CHP Ltd is therefore applying as a refurbishing CMU as the old ST is being replaced by a new, correctly sized ST (14.63 MW) to be commissioned in September 2015. The new steam turbine has been ordered and approximately £1.3m of the £5.5m project cost has been incurred already. As a consequence, the refurbishment is a capacity reduction. The CHP Plant parasitic load is 3 MW and the CHP supplies on average 13.74 MW to four other users at two different locations in Northwich (Winnington and Lostock) by private wire (Tata Chemicals Europe Ltd (TCE) Winnington: 3.33 MW, TCE Lostock: 5.53 MW, Ineos Winnington: 0.47 MW, Ineos Lostock: 4.41 MW). The calculation methods used for the Available Capacity of each generating unit are based on Rule 3.5.2(c)(iii)(bb) for the new ST and Rule 3.5.2(c)(i) for both GT’s. The parasitic and associated loads were prorated and assigned to each generating unit without weighting to obtain the Available Capacity of each unit. The Anticipated De-rated Capacity of the CMU is 71.25 MW. Winnington CHP exports to the Distribution system via a single MPAN, at 132KV. The connection agreement permits an export in excess of the Anticipated De-rated capacity of the refurbished CMU.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity
null
Post-Refurbishing De-Rated Capacity
null
Generating Capacity of on-site Generating Unit
null

Field Value
_id 2195
Type T-4
CMU ID WNCHP1
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
CM Unit Name WINCHP
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2018
Opt Out Status Opt-In
Opt-Out Reason N/A (Opt-in)
Parent Company
null
DSR Test Method
null
Is FCM required
null
CM Unit Category Refurbishing CMU
Storage Facility
null
De-Rated Capacity (empty)
Name of Applicant Winnington CHP Limited
Primary Fuel Type
null
Registered Holder Winnington CHP Limited
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover
null
Termination Fee 1 Rate £5,000/MW
Termination Fee 2 Rate £25,000/MW
Termination Fee 3 Rate
null
Termination Fee 4 Rate
null
Termination Fee 5 Rate
null
Connection / DSR Capacity 77
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status Refurbishing and Existing CM Unit
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2018-WNCHP1-00001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity (empty)
Term of the Capacity Agreement 1
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
Pre-Refurbishment Bidding Status Refurbishing and Existing CM Unit
Secondary Trading Contact - Email
null
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity 71.244
Date of Issue of Capacity Agreement 2015-01-30
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity 71.244
Auction Acquired Capacity Obligation 71.244
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone
null
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2018/2019
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
Anticipated Pre-Refurbishing De-Rated Capacity 109.188
Anticipated Post-Refurbishing De-Rated Capacity 71.24369
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement
null