Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.
Field | Value |
---|---|
_id | 577826 |
Type | T-4 |
rank | 0.0573088 |
CMU ID | WNCHP1 |
Auction Name | 2018-19 (T-4) Four Year Ahead Capacity Auction |
Component ID | 1 |
Delivery Year | 2018 |
De-Rated Capacity |
null |
OS Grid Reference |
null |
Proven DSR Capacity |
null |
Location and Post Code |
null |
Connection / DSR Capacity |
null |
Primary Fuel of Component |
null |
Generating Technology Class |
null |
Description of CMU Components | Winnington CHP is an unlicensed (100 MW export limit) non-CMRS Refurbishing Generating CMU which provides heat and power to various adjoining manufacturing sites via pipeline and a large private wire system (Associated Load). It is located in Northwich, Cheshire and consists of three generating units: 1 gas turbine (GT) and 1 steam turbine (ST) (CHP Technology Class) and 1 gas turbine (OCGT technology class). The original configuration of the CHP is 2 x GT 39.97 MW each, both feeding into separate Heat Recovery Boilers, and 1 x ST 58.12 MW (Unit Registered Capacity). These are calculated values from the Distribution Connection and Use of System Agreement values given as: each GT 47.024 MVA, ST 68.38 MVA and using a power factor of 0.85 (also from Connection Agreement). Due to recent (Feb 2014) permanent operational changes resulting in a significant reduction in steam demand from the CHP Plant, the 58.12 MW steam turbine can no longer be operated. Winnington CHP Ltd is therefore applying as a refurbishing CMU as the old ST is being replaced by a new, correctly sized ST (14.63 MW) to be commissioned in September 2015. The new steam turbine has been ordered and approximately £1.3m of the £5.5m project cost has been incurred already. As a consequence, the refurbishment is a capacity reduction. The CHP Plant parasitic load is 3 MW and the CHP supplies on average 13.74 MW to four other users at two different locations in Northwich (Winnington and Lostock) by private wire (Tata Chemicals Europe Ltd (TCE) Winnington: 3.33 MW, TCE Lostock: 5.53 MW, Ineos Winnington: 0.47 MW, Ineos Lostock: 4.41 MW). The calculation methods used for the Available Capacity of each generating unit are based on Rule 3.5.2(c)(iii)(bb) for the new ST and Rule 3.5.2(c)(i) for both GT’s. The parasitic and associated loads were prorated and assigned to each generating unit without weighting to obtain the Available Capacity of each unit. The Anticipated De-rated Capacity of the CMU is 71.25 MW. Winnington CHP exports to the Distribution system via a single MPAN, at 132KV. The connection agreement permits an export in excess of the Anticipated De-rated capacity of the refurbished CMU. |
Permitted on-Site Generating Unit |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Post-Refurbishing De-Rated Capacity |
null |
Generating Capacity of on-site Generating Unit |
null |
Field | Value |
---|---|
_id | 2195 |
Type | T-4 |
CMU ID | WNCHP1 |
Auction | Capacity Auction |
Agent Name |
null |
Beta Value |
null |
Auction Name | 2018-19 (T-4) Four Year Ahead Capacity Auction |
CM Unit Name | WINCHP |
CM Unit Type | Non CMRS |
TEC Deferral |
null |
Unproven DSR |
null |
Delivery Year | 2018 |
Opt Out Status | Opt-In |
Opt-Out Reason | N/A (Opt-in) |
Parent Company |
null |
DSR Test Method |
null |
Is FCM required |
null |
CM Unit Category | Refurbishing CMU |
Storage Facility |
null |
De-Rated Capacity | (empty) |
Name of Applicant | Winnington CHP Limited |
Primary Fuel Type |
null |
Registered Holder | Winnington CHP Limited |
Annual Penalty Cap | 1 |
Monthly Penalty Cap | 2 |
Proven DSR Capacity |
null |
DSR Bidding Capacity |
null |
Amount of Credit Cover |
null |
Termination Fee 1 Rate | £5,000/MW |
Termination Fee 2 Rate | £25,000/MW |
Termination Fee 3 Rate |
null |
Termination Fee 4 Rate |
null |
Termination Fee 5 Rate |
null |
Connection / DSR Capacity | 77 |
Maximum Obligation Period | 1 |
Capacity Agreement Awarded | Yes |
Pre-Qualification Decision | Prequalified |
Capacity obligation Summary |
null |
Pre-Refurbishing CMU Status | Refurbishing and Existing CM Unit |
Transmission / Distribution | Distribution |
Unique Agreement Identifier | CAN-2018-WNCHP1-00001 |
New Build Yet to Satisfy FCM |
null |
Planning Consents Conditions |
null |
Anticipated De-Rated Capacity | (empty) |
Term of the Capacity Agreement | 1 |
Nature of the Security Interest |
null |
CMU confirmed entry into Auction | Yes |
Is Connection Agreement required | |
Pre-Refurbishment Bidding Status | Refurbishing and Existing CM Unit |
Secondary Trading Contact - Email |
null |
Date for provision of deferred TEC |
null |
Pre-Refurbishing De-Rated Capacity | 71.244 |
Date of Issue of Capacity Agreement | 2015-01-30 |
List of Traded Capacity Obligations |
null |
Post-Refurbishing De-Rated Capacity | 71.244 |
Auction Acquired Capacity Obligation | 71.244 |
Date of Issue of DSR Test Certificate |
null |
Has Capacity Agreement been Suspended |
null |
Period for which the transfer applies |
null |
Secondary Trading Contact - Telephone |
null |
Capacity Agreement has been Terminated |
null |
Duration of Capacity Agreement Awarded | 1 |
Date for Financial Commitment Milestone |
null |
Delivery Years for which Agreement Valid | 2018/2019 |
Connection Agreement Deferral Declaration |
null |
Date of Termination of Capacity Agreement |
null |
Latest Date SCM is expected to be achieved |
null |
Subject to Substantial Completion Milestone |
null |
Subject to a Minimum Completion Requirement |
null |
Earliest Date SCM is expected to be achieved |
null |
Is copy of Grid Connection Agreement required | |
Anticipated Pre-Refurbishing De-Rated Capacity | 109.188 |
Anticipated Post-Refurbishing De-Rated Capacity | 71.24369 |
Legal Name of any Person with a Security Interest |
null |
Date for provision of deferred Connection Agreement |
null |
Duration of Capacity Agreement in First Bidding Round | 1 |
Long-Stop Date for the Minimum Completion Requirement |
null |