Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.
Field | Value |
---|---|
_id | 577795 |
Type | T-4 |
rank | 0.253734 |
CMU ID | TYSE-1 |
Auction Name | 2018-19 (T-4) Four Year Ahead Capacity Auction |
Component ID | TYSE-1 |
Delivery Year | 2018 |
De-Rated Capacity | 25.193 |
OS Grid Reference |
null |
Proven DSR Capacity |
null |
Location and Post Code |
null |
Connection / DSR Capacity | 23.39 |
Primary Fuel of Component |
null |
Generating Technology Class |
null |
Description of CMU Components | Energy from waste facility located in Tyseley Birmingham Postcode B11 2BA. It is a municipal waste incineration plant. It is based on two boilers supplying steam to one turbine generator. Exhaust steam is condensed in a Air cooled condenser. The site normally operates at baseload at 100% capacity. The auxiliary load is self supplied by the generator prior to export metering. The power factor used is 0.85 for this CMU. We found out that using the rules' method to calculate the capacity some of our plants would not be able to meet their obligation. For instance:Tyseley ERF would have to register for 28.74 MW (de-rated to 25.19 MW). And in the past two years during winter period the plant generated that capacity only 45 % of the time. This is due to the plant technology: it is an Energy from waste facility. Waste is a fuel whose characteristics (moisture content-calorific value...) can change during the year and therefore the output of the plants can change a lot. We can therefore have a few high generation periods in the year in the conditions are good and a lower generation the other times. Therefore we decided to calculate ourselves a capacity we would be confident to register with. We would then compare it to the rules' method calculated value; If the new value is higher than the one calculated with the rules' method then we followed the rules' method. If our method would give a lower capacity; we selected the value calculated with our method. The method used is: the de rated capacity we are pre-qualifying for to bid is calculated based on the two past years winter historical output (see documents). The de-rated capacity is calculated as the capacity the plant was able to achieve 80% of the time in the previous two winters. Then the value was multiplied by the inverse of the de-rating factor to obtain the Connection capacity. For this plant using the rules we should register for 28.74MW but we would only be able dto provide that 45 % of the time. The value we are able to provide 80 % of the time during winter is a derated capacity of 20.1 MW which means a "re-rated" capacity to register for of 23.39 MW. The meters that will be used are the same meter as the one used for the CHPQA accreditation and LECs submissions to OFGEM and the HH settlement meter used for our export contracts. |
Permitted on-Site Generating Unit |
null |
Pre-Refurbishing De-Rated Capacity | 0 |
Post-Refurbishing De-Rated Capacity | 0 |
Generating Capacity of on-site Generating Unit |
null |
Field | Value |
---|---|
_id | 2164 |
Type | T-4 |
CMU ID | TYSE-1 |
Auction | Capacity Auction |
Agent Name |
null |
Beta Value |
null |
Auction Name | 2018-19 (T-4) Four Year Ahead Capacity Auction |
CM Unit Name | Tyseley ERF |
CM Unit Type | Non CMRS |
TEC Deferral |
null |
Unproven DSR |
null |
Delivery Year | 2018 |
Opt Out Status | Opt-In |
Opt-Out Reason | N/A (Opt-in) |
Parent Company |
null |
DSR Test Method |
null |
Is FCM required | |
CM Unit Category | Existing Generating CMU |
Storage Facility |
null |
De-Rated Capacity | 25.193 |
Name of Applicant | Veolia UK Limited |
Primary Fuel Type |
null |
Registered Holder | Veolia UK Limited |
Annual Penalty Cap | 1 |
Monthly Penalty Cap | 2 |
Proven DSR Capacity |
null |
DSR Bidding Capacity |
null |
Amount of Credit Cover |
null |
Termination Fee 1 Rate | £5,000/MW |
Termination Fee 2 Rate | £25,000/MW |
Termination Fee 3 Rate |
null |
Termination Fee 4 Rate |
null |
Termination Fee 5 Rate |
null |
Connection / DSR Capacity | 23.39 |
Maximum Obligation Period | 1 |
Capacity Agreement Awarded | Yes |
Pre-Qualification Decision | Prequalified |
Capacity obligation Summary |
null |
Pre-Refurbishing CMU Status |
null |
Transmission / Distribution | Distribution |
Unique Agreement Identifier | CAN-2018-TYSE-1-00001 |
New Build Yet to Satisfy FCM |
null |
Planning Consents Conditions |
null |
Anticipated De-Rated Capacity | 20.498996 |
Term of the Capacity Agreement | 1 |
Nature of the Security Interest |
null |
CMU confirmed entry into Auction | Yes |
Is Connection Agreement required | |
Pre-Refurbishment Bidding Status | N/A |
Secondary Trading Contact - Email |
null |
Date for provision of deferred TEC |
null |
Pre-Refurbishing De-Rated Capacity | (empty) |
Date of Issue of Capacity Agreement | 2015-01-30 |
List of Traded Capacity Obligations |
null |
Post-Refurbishing De-Rated Capacity | (empty) |
Auction Acquired Capacity Obligation | 25.193 |
Date of Issue of DSR Test Certificate |
null |
Has Capacity Agreement been Suspended |
null |
Period for which the transfer applies |
null |
Secondary Trading Contact - Telephone |
null |
Capacity Agreement has been Terminated |
null |
Duration of Capacity Agreement Awarded | 1 |
Date for Financial Commitment Milestone |
null |
Delivery Years for which Agreement Valid | 2018/2019 |
Connection Agreement Deferral Declaration |
null |
Date of Termination of Capacity Agreement |
null |
Latest Date SCM is expected to be achieved |
null |
Subject to Substantial Completion Milestone |
null |
Subject to a Minimum Completion Requirement |
null |
Earliest Date SCM is expected to be achieved |
null |
Is copy of Grid Connection Agreement required | |
Anticipated Pre-Refurbishing De-Rated Capacity | (empty) |
Anticipated Post-Refurbishing De-Rated Capacity | (empty) |
Legal Name of any Person with a Security Interest |
null |
Date for provision of deferred Connection Agreement |
null |
Duration of Capacity Agreement in First Bidding Round | 1 |
Long-Stop Date for the Minimum Completion Requirement |
null |