General Information

Key Details
  • Description We note that this is not a mandatory field according to the Prequalifiaction Application: User Guidelines. The proposed South Hook combined heat and power (CHP) station is being developed on the site of the existing South Hook LNG Terminal near Herbrandston Pembrokeshire in Wales. The site is centred at National Grid Reference SM 874 063. Neither the auxillary load or the Associated Load (question AY) have been taken account of within the CMU component. We cannot see a definition of 'Associated Load' within the Capacity Market Rules and assume that this relates to private wires and will be dealt with the the Approved Metering Solution. We anticipate that the private wire and the auxillary load will be separately metered but this is not yet designed.
  • Auction 2018-19 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2018
Geocoding Status: Yes

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 450 MW
  • De-Rated Capacity (CMU Registry) 450
  • Connection Capacity (CMU Registry) 500 MW
  • Anticipated Capacity (CMU Registry) 450 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name South Hook CHP Limited
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) N/A

Field Value
_id 577728
Type T-4
rank 0.0706241
CMU ID SHCHP1
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
Component ID SHCHP1
Delivery Year 2018
De-Rated Capacity 450
OS Grid Reference
null
Proven DSR Capacity
null
Location and Post Code
null
Connection / DSR Capacity 500
Primary Fuel of Component
null
Generating Technology Class
null
Description of CMU Components We note that this is not a mandatory field according to the Prequalifiaction Application: User Guidelines. The proposed South Hook combined heat and power (CHP) station is being developed on the site of the existing South Hook LNG Terminal near Herbrandston Pembrokeshire in Wales. The site is centred at National Grid Reference SM 874 063. Neither the auxillary load or the Associated Load (question AY) have been taken account of within the CMU component. We cannot see a definition of 'Associated Load' within the Capacity Market Rules and assume that this relates to private wires and will be dealt with the the Approved Metering Solution. We anticipate that the private wire and the auxillary load will be separately metered but this is not yet designed.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity 0
Post-Refurbishing De-Rated Capacity 0
Generating Capacity of on-site Generating Unit
null

Field Value
_id 2111
Type T-4
CMU ID SHCHP1
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
CM Unit Name South Hook CHP (SHCHP1)
CM Unit Type CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2018
Opt Out Status Opt-In
Opt-Out Reason N/A (Opt-in)
Parent Company
null
DSR Test Method
null
Is FCM required
null
CM Unit Category New Build Generating CMU
Storage Facility
null
De-Rated Capacity 450
Name of Applicant South Hook CHP Limited
Primary Fuel Type
null
Registered Holder
null
Annual Penalty Cap
null
Monthly Penalty Cap
null
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate
null
Termination Fee 2 Rate
null
Termination Fee 3 Rate
null
Termination Fee 4 Rate
null
Termination Fee 5 Rate
null
Connection / DSR Capacity 500
Maximum Obligation Period 15
Capacity Agreement Awarded No
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Transmission
Unique Agreement Identifier
null
New Build Yet to Satisfy FCM Yes
Planning Consents Conditions
null
Anticipated De-Rated Capacity 450
Term of the Capacity Agreement
null
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status N/A
Secondary Trading Contact - Email
null
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement
null
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation
null
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone
null
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded
null
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid
null
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 15
Long-Stop Date for the Minimum Completion Requirement
null