  • Description Location Peterborough Power Station (PPS) is located on the eastern outskirts of Peterborough on Storeys Bar Road Peterborough PE1 5NT at national grid reference x:521800 y:299400. The power station is located on the eastern edge of the Eastern Industries industrial estate with other industrial areas located from the southeast to northeast of the site. The remaining land surrounding the power station is predominantly fenland used for cropping and the site is located on a relatively flat area. The power station site occupies an area of 7.3 hectares. Plant Two Gas Turbines (GTs) operating in Open Cycle Gas Turbine (OCGT) configuration comprising: Two Frame 9E GTs with electrical generators; Connection to the 132000 volt electrical distribution system; and Diesel black-start capability. Metering Electrical Generation is MVRNd to the BRITGAS trading account. Site Works Power is netted off Total Generation to leave the balance as net export to the National Grid.
  • Auction 2018-19 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2018
Geocoding Status: Yes

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 230.70 MW
  • De-Rated Capacity (CMU Registry) 230.70
  • Connection Capacity (CMU Registry) 246.45 MW
  • Anticipated Capacity (CMU Registry) 230.68 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name Centrica plc
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) N/A

Field Value
_id 577680
Type T-4
rank 0.0706241
CMU ID PETEM0
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
Component ID PETEM0
Delivery Year 2018
De-Rated Capacity 230.701
OS Grid Reference
null
Proven DSR Capacity
null
Location and Post Code
null
Connection / DSR Capacity 246.449
Primary Fuel of Component
null
Generating Technology Class
null
Description of CMU Components Location Peterborough Power Station (PPS) is located on the eastern outskirts of Peterborough on Storeys Bar Road Peterborough PE1 5NT at national grid reference x:521800 y:299400. The power station is located on the eastern edge of the Eastern Industries industrial estate with other industrial areas located from the southeast to northeast of the site. The remaining land surrounding the power station is predominantly fenland used for cropping and the site is located on a relatively flat area. The power station site occupies an area of 7.3 hectares. Plant Two Gas Turbines (GTs) operating in Open Cycle Gas Turbine (OCGT) configuration comprising: Two Frame 9E GTs with electrical generators; Connection to the 132000 volt electrical distribution system; and Diesel black-start capability. Metering Electrical Generation is MVRNd to the BRITGAS trading account. Site Works Power is netted off Total Generation to leave the balance as net export to the National Grid.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity 0
Post-Refurbishing De-Rated Capacity 0
Generating Capacity of on-site Generating Unit
null

Field Value
_id 2073
Type T-4
CMU ID PETEM0
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
CM Unit Name E_PETEM1
CM Unit Type CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2018
Opt Out Status Opt-In
Opt-Out Reason N/A (Opt-in)
Parent Company
null
DSR Test Method
null
Is FCM required
null
CM Unit Category Existing Generating CMU
Storage Facility
null
De-Rated Capacity 230.701
Name of Applicant Centrica plc
Primary Fuel Type
null
Registered Holder
null
Annual Penalty Cap
null
Monthly Penalty Cap
null
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover
null
Termination Fee 1 Rate
null
Termination Fee 2 Rate
null
Termination Fee 3 Rate
null
Termination Fee 4 Rate
null
Termination Fee 5 Rate
null
Connection / DSR Capacity 246.449
Maximum Obligation Period 1
Capacity Agreement Awarded No
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier
null
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 230.683123
Term of the Capacity Agreement
null
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
null
Pre-Refurbishment Bidding Status N/A
Secondary Trading Contact - Email
null
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement
null
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation
null
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone
null
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded
null
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid
null
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
null
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement
null