Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.
Field | Value |
---|---|
_id | 577680 |
Type | T-4 |
rank | 0.0706241 |
CMU ID | PETEM0 |
Auction Name | 2018-19 (T-4) Four Year Ahead Capacity Auction |
Component ID | PETEM0 |
Delivery Year | 2018 |
De-Rated Capacity | 230.701 |
OS Grid Reference |
null |
Proven DSR Capacity |
null |
Location and Post Code |
null |
Connection / DSR Capacity | 246.449 |
Primary Fuel of Component |
null |
Generating Technology Class |
null |
Description of CMU Components | Location Peterborough Power Station (PPS) is located on the eastern outskirts of Peterborough on Storeys Bar Road Peterborough PE1 5NT at national grid reference x:521800 y:299400. The power station is located on the eastern edge of the Eastern Industries industrial estate with other industrial areas located from the southeast to northeast of the site. The remaining land surrounding the power station is predominantly fenland used for cropping and the site is located on a relatively flat area. The power station site occupies an area of 7.3 hectares. Plant Two Gas Turbines (GTs) operating in Open Cycle Gas Turbine (OCGT) configuration comprising: Two Frame 9E GTs with electrical generators; Connection to the 132000 volt electrical distribution system; and Diesel black-start capability. Metering Electrical Generation is MVRNd to the BRITGAS trading account. Site Works Power is netted off Total Generation to leave the balance as net export to the National Grid. |
Permitted on-Site Generating Unit |
null |
Pre-Refurbishing De-Rated Capacity | 0 |
Post-Refurbishing De-Rated Capacity | 0 |
Generating Capacity of on-site Generating Unit |
null |
Field | Value |
---|---|
_id | 2073 |
Type | T-4 |
CMU ID | PETEM0 |
Auction | Capacity Auction |
Agent Name |
null |
Beta Value |
null |
Auction Name | 2018-19 (T-4) Four Year Ahead Capacity Auction |
CM Unit Name | E_PETEM1 |
CM Unit Type | CMRS |
TEC Deferral |
null |
Unproven DSR |
null |
Delivery Year | 2018 |
Opt Out Status | Opt-In |
Opt-Out Reason | N/A (Opt-in) |
Parent Company |
null |
DSR Test Method |
null |
Is FCM required |
null |
CM Unit Category | Existing Generating CMU |
Storage Facility |
null |
De-Rated Capacity | 230.701 |
Name of Applicant | Centrica plc |
Primary Fuel Type |
null |
Registered Holder |
null |
Annual Penalty Cap |
null |
Monthly Penalty Cap |
null |
Proven DSR Capacity |
null |
DSR Bidding Capacity |
null |
Amount of Credit Cover |
null |
Termination Fee 1 Rate |
null |
Termination Fee 2 Rate |
null |
Termination Fee 3 Rate |
null |
Termination Fee 4 Rate |
null |
Termination Fee 5 Rate |
null |
Connection / DSR Capacity | 246.449 |
Maximum Obligation Period | 1 |
Capacity Agreement Awarded | No |
Pre-Qualification Decision | Prequalified |
Capacity obligation Summary |
null |
Pre-Refurbishing CMU Status |
null |
Transmission / Distribution | Distribution |
Unique Agreement Identifier |
null |
New Build Yet to Satisfy FCM |
null |
Planning Consents Conditions |
null |
Anticipated De-Rated Capacity | 230.683123 |
Term of the Capacity Agreement |
null |
Nature of the Security Interest |
null |
CMU confirmed entry into Auction | Yes |
Is Connection Agreement required |
null |
Pre-Refurbishment Bidding Status | N/A |
Secondary Trading Contact - Email |
null |
Date for provision of deferred TEC |
null |
Pre-Refurbishing De-Rated Capacity | (empty) |
Date of Issue of Capacity Agreement |
null |
List of Traded Capacity Obligations |
null |
Post-Refurbishing De-Rated Capacity | (empty) |
Auction Acquired Capacity Obligation |
null |
Date of Issue of DSR Test Certificate |
null |
Has Capacity Agreement been Suspended |
null |
Period for which the transfer applies |
null |
Secondary Trading Contact - Telephone |
null |
Capacity Agreement has been Terminated |
null |
Duration of Capacity Agreement Awarded |
null |
Date for Financial Commitment Milestone |
null |
Delivery Years for which Agreement Valid |
null |
Connection Agreement Deferral Declaration |
null |
Date of Termination of Capacity Agreement |
null |
Latest Date SCM is expected to be achieved |
null |
Subject to Substantial Completion Milestone |
null |
Subject to a Minimum Completion Requirement |
null |
Earliest Date SCM is expected to be achieved |
null |
Is copy of Grid Connection Agreement required |
null |
Anticipated Pre-Refurbishing De-Rated Capacity | (empty) |
Anticipated Post-Refurbishing De-Rated Capacity | (empty) |
Legal Name of any Person with a Security Interest |
null |
Date for provision of deferred Connection Agreement |
null |
Duration of Capacity Agreement in First Bidding Round | 1 |
Long-Stop Date for the Minimum Completion Requirement |
null |