General Information

Key Details
  • Description Energy from waste facility located in Newhaven East Sussex - Postcode BN9 0AB. It is a municipal waste incineration plant. It is based on two boilers supplying steam to one turbine-generator. Exhaust steam is condensed in a Air cooled condenser. The site normally operates at baseload. The auxiliary load is self supplied by the generator prior to export metering. The connection capacity used is the summer one. The power factor used is 0.85 for this CMU. We found out that using the rules' method to calculate the capacity some of our plants would not be able to meet their obligation. For instance:Tyseley ERF would have to register for 28.74 MW (de-rated to 25.19 MW). And in the past two years during winter period the plant generated that capacity only 45 % of the time. This is due to the plant technology: it is an Energy from waste facility. Waste is a fuel whose characteristics (moisture content-calorific value...) can change during the year and therefore the output of the plants can change a lot. We can therefore have a few high generation periods in the year in the conditions are good and a lower generation the other times. Therefore we decided to calculate ourselves a capacity we would be confident to register with. We would then compare it to the rules' method calculated value; If the new value is higher than the one calculated with the rules' method then we followed the rules' method. If our method would give a lower capacity; we selected the value calculated with our method. The method used is: the de rated capacity we are pre-qualifying for to bid is calculated based on the two past years winter historical output (see documents). The de-rated capacity is calculated as the capacity the plant was able to achieve 80% of the time in the previous two winters. Then the value was multiplied by the inverse of the de-rating factor to obtain the Connection capacity. This site would achieve the CM' claculated capacity of 15.3 MW more than 90 % of the time so we followed the CM' rules way of calculating for this site. The meters that will be used are the same meter as the one used for the CHPQA accreditation and LECs submissions to OFGEM and the HH settlement meter used for our export contracts.
  • Auction 2018-19 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2018
Geocoding Status: Yes

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 13.41 MW
  • De-Rated Capacity (CMU Registry) 13.41
  • Connection Capacity (CMU Registry) 15.30 MW
  • Anticipated Capacity (CMU Registry) 13.41 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name Veolia UK Limited
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) N/A

Field Value
_id 577632
Type T-4
rank 0.253734
CMU ID NEWH-1
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
Component ID NEWH-1
Delivery Year 2018
De-Rated Capacity 13.408
OS Grid Reference
null
Proven DSR Capacity
null
Location and Post Code
null
Connection / DSR Capacity 15.3
Primary Fuel of Component
null
Generating Technology Class
null
Description of CMU Components Energy from waste facility located in Newhaven East Sussex - Postcode BN9 0AB. It is a municipal waste incineration plant. It is based on two boilers supplying steam to one turbine-generator. Exhaust steam is condensed in a Air cooled condenser. The site normally operates at baseload. The auxiliary load is self supplied by the generator prior to export metering. The connection capacity used is the summer one. The power factor used is 0.85 for this CMU. We found out that using the rules' method to calculate the capacity some of our plants would not be able to meet their obligation. For instance:Tyseley ERF would have to register for 28.74 MW (de-rated to 25.19 MW). And in the past two years during winter period the plant generated that capacity only 45 % of the time. This is due to the plant technology: it is an Energy from waste facility. Waste is a fuel whose characteristics (moisture content-calorific value...) can change during the year and therefore the output of the plants can change a lot. We can therefore have a few high generation periods in the year in the conditions are good and a lower generation the other times. Therefore we decided to calculate ourselves a capacity we would be confident to register with. We would then compare it to the rules' method calculated value; If the new value is higher than the one calculated with the rules' method then we followed the rules' method. If our method would give a lower capacity; we selected the value calculated with our method. The method used is: the de rated capacity we are pre-qualifying for to bid is calculated based on the two past years winter historical output (see documents). The de-rated capacity is calculated as the capacity the plant was able to achieve 80% of the time in the previous two winters. Then the value was multiplied by the inverse of the de-rating factor to obtain the Connection capacity. This site would achieve the CM' claculated capacity of 15.3 MW more than 90 % of the time so we followed the CM' rules way of calculating for this site. The meters that will be used are the same meter as the one used for the CHPQA accreditation and LECs submissions to OFGEM and the HH settlement meter used for our export contracts.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity 0
Post-Refurbishing De-Rated Capacity 0
Generating Capacity of on-site Generating Unit
null

Field Value
_id 2042
Type T-4
CMU ID NEWH-1
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Newhaven ERF
CM Unit Type Non CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2018
Opt Out Status Opt-In
Opt-Out Reason N/A (Opt-in)
Parent Company
null
DSR Test Method
null
Is FCM required
CM Unit Category Existing Generating CMU
Storage Facility
null
De-Rated Capacity 13.408
Name of Applicant Veolia UK Limited
Primary Fuel Type
null
Registered Holder Veolia UK Limited
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover
null
Termination Fee 1 Rate £5,000/MW
Termination Fee 2 Rate £25,000/MW
Termination Fee 3 Rate
null
Termination Fee 4 Rate
null
Termination Fee 5 Rate
null
Connection / DSR Capacity 15.3
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2018-NEWH-1-00001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 13.40892
Term of the Capacity Agreement 1
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
Pre-Refurbishment Bidding Status N/A
Secondary Trading Contact - Email
null
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2015-01-30
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 13.408
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone
null
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2018/2019
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement
null