N/A Map

General Information

Key Details
  • Description Address: EDF Energy, Hinkley Point B power station, Nr Bridgwater, Somerset, TA5 1UD Description: Hinkley Point B Power Station CMU 8: [HINB-8], comprising the following BMU algebra: T_HINB-8 + (50% x T_HINB-D) The other 50% of T_HINB-D is allocated to [HINB-7], the MSID submitted for CMU [HINB-8] also appears in the submission for [HINB-7]. For more information see the metering line diagram and associated information submitted as a separate .pdf file
  • Auction 2018-19 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2018
Geocoding Status: Yes

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 0 MW
  • De-Rated Capacity (CMU Registry) 0
  • Connection Capacity (CMU Registry) 528 MW
  • Anticipated Capacity (CMU Registry) 0 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name EDF Energy Nuclear Generation Limited
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) N/A

Field Value
_id 577578
Type T-4
rank 0.253734
CMU ID HP8-14
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
Component ID HP8-14
Delivery Year 2018
De-Rated Capacity (empty)
OS Grid Reference
null
Proven DSR Capacity
null
Location and Post Code
null
Connection / DSR Capacity 528
Primary Fuel of Component
null
Generating Technology Class
null
Description of CMU Components Address: EDF Energy, Hinkley Point B power station, Nr Bridgwater, Somerset, TA5 1UD Description: Hinkley Point B Power Station CMU 8: [HINB-8], comprising the following BMU algebra: T_HINB-8 + (50% x T_HINB-D) The other 50% of T_HINB-D is allocated to [HINB-7], the MSID submitted for CMU [HINB-8] also appears in the submission for [HINB-7]. For more information see the metering line diagram and associated information submitted as a separate .pdf file
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity 429.739
Post-Refurbishing De-Rated Capacity 429.739
Generating Capacity of on-site Generating Unit
null

Field Value
_id 1995
Type T-4
CMU ID HP8-14
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Hinkley Point B Power Station CMU 8
CM Unit Type CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2018
Opt Out Status Opt-In
Opt-Out Reason N/A (Opt-in)
Parent Company
null
DSR Test Method
null
Is FCM required
CM Unit Category Refurbishing CMU
Storage Facility
null
De-Rated Capacity (empty)
Name of Applicant EDF Energy Nuclear Generation Limited
Primary Fuel Type
null
Registered Holder EDF Energy Nuclear Generation Limited
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover
null
Termination Fee 1 Rate £5,000/MW
Termination Fee 2 Rate £25,000/MW
Termination Fee 3 Rate
null
Termination Fee 4 Rate
null
Termination Fee 5 Rate
null
Connection / DSR Capacity 528
Maximum Obligation Period 3
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary
null
Pre-Refurbishing CMU Status Refurbishing and Existing CM Unit
Transmission / Distribution Transmission
Unique Agreement Identifier CAN-2018-HP8-14-00001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity (empty)
Term of the Capacity Agreement 1
Nature of the Security Interest
null
CMU confirmed entry into Auction Yes
Is Connection Agreement required
Pre-Refurbishment Bidding Status Refurbishing and Existing CM Unit
Secondary Trading Contact - Email
null
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity 429.739
Date of Issue of Capacity Agreement 2015-01-30
List of Traded Capacity Obligations
null
Post-Refurbishing De-Rated Capacity 429.739
Auction Acquired Capacity Obligation 429.739
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies
null
Secondary Trading Contact - Telephone
null
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2018/2019
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
Anticipated Pre-Refurbishing De-Rated Capacity 429.7392
Anticipated Post-Refurbishing De-Rated Capacity 429.7392
Legal Name of any Person with a Security Interest
null
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 3
Long-Stop Date for the Minimum Completion Requirement
null