N/A Map

General Information

Key Details
  • Description Wallingford Oxfordshire. New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. Auxiliary load will be fed from before the metering and is therefore taken into account when delivering.
  • Auction 2018-19 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2018
Geocoding Status: Yes

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) 11.23 MW
  • De-Rated Capacity (CMU Registry) 11.23
  • Connection Capacity (CMU Registry) 12 MW
  • Anticipated Capacity (CMU Registry) 11.23 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name Conrad (Lester Way) Limited
  • Parent Company (CMU Registry) N/A
  • Secondary Trading Email (CMU Registry) N/A
  • Secondary Trading Phone (CMU Registry) N/A

Field Value
_id 577562
Type T-4
rank 0.0706241
CMU ID GFELES
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
Component ID GFELES
Delivery Year 2018
De-Rated Capacity 11.233
OS Grid Reference
null
Proven DSR Capacity
null
Location and Post Code
null
Connection / DSR Capacity 12
Primary Fuel of Component
null
Generating Technology Class
null
Description of CMU Components Wallingford Oxfordshire. New build CMU employing reciprocating engines running on natural gas. The Financial Commitment Milestone has been achieved. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW. Auxiliary load will be fed from before the metering and is therefore taken into account when delivering.
Permitted on-Site Generating Unit
null
Pre-Refurbishing De-Rated Capacity 0
Post-Refurbishing De-Rated Capacity 0
Generating Capacity of on-site Generating Unit
null

Field Value
_id 1980
Type T-4
CMU ID GFELES
Auction Capacity Auction
Agent Name
null
Beta Value
null
Auction Name 2018-19 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Lester Way
CM Unit Type CMRS
TEC Deferral
null
Unproven DSR
null
Delivery Year 2018
Opt Out Status Opt-In
Opt-Out Reason N/A (Opt-in)
Parent Company
null
DSR Test Method
null
Is FCM required
CM Unit Category New Build Generating CMU
Storage Facility
null
De-Rated Capacity 11.233
Name of Applicant Conrad (Lester Way) Limited
Primary Fuel Type
null
Registered Holder Conrad (Lester Way) Limited
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity
null
DSR Bidding Capacity
null
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5,000/MW
Termination Fee 2 Rate £25,000/MW
Termination Fee 3 Rate
null
Termination Fee 4 Rate
null
Termination Fee 5 Rate
null
Connection / DSR Capacity 12
Maximum Obligation Period 15
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary 01/10/2018 - 09/02/2023 = 11.233 MW; 10/02/2023 - 30/09/2023 = 5.233 MW; 01/10/2023 - 30/09/2033 = 11.233 MW
Pre-Refurbishing CMU Status
null
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2018-GFELES-00001
New Build Yet to Satisfy FCM
null
Planning Consents Conditions
null
Anticipated De-Rated Capacity 11.2332
Term of the Capacity Agreement 15
Nature of the Security Interest First fixed charge over all rights in respect of the Capacity Agreement
CMU confirmed entry into Auction Yes
Is Connection Agreement required
Pre-Refurbishment Bidding Status N/A
Secondary Trading Contact - Email
null
Date for provision of deferred TEC
null
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2015-01-30
List of Traded Capacity Obligations T1: -6.000MW
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 11.233
Date of Issue of DSR Test Certificate
null
Has Capacity Agreement been Suspended
null
Period for which the transfer applies T1: 10/02/2023 - 30/09/2023 T2 01/10/2023 - 30/09/2023
Secondary Trading Contact - Telephone
null
Capacity Agreement has been Terminated
null
Duration of Capacity Agreement Awarded 15
Date for Financial Commitment Milestone
null
Delivery Years for which Agreement Valid 2018/2019, 2019/2020, 2020/2021, 2021/2022, 2022/2023, 2023/2024, 2024/2025, 2025/2026, 2026/2027, 2027/2028, 2028/2029, 2029/2030, 2030/2031, 2031/2032, 2032/2033
Connection Agreement Deferral Declaration
null
Date of Termination of Capacity Agreement
null
Latest Date SCM is expected to be achieved
null
Subject to Substantial Completion Milestone
null
Subject to a Minimum Completion Requirement
null
Earliest Date SCM is expected to be achieved
null
Is copy of Grid Connection Agreement required
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest National Westminster Bank Plc
Date for provision of deferred Connection Agreement
null
Duration of Capacity Agreement in First Bidding Round 15
Long-Stop Date for the Minimum Completion Requirement
null