Land at Stanhope Industrial Estate, Wharf Road, Standford-Le-Hope SS17 0EH Map

General Information

Key Details
  • Description 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Stanford le-hope
  • Auction 2025-26 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2025
Geocoding Status: Yes

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 19.09
  • Connection Capacity (CMU Registry) 20 MW
  • Anticipated Capacity (CMU Registry) 19.09 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name EL (SLH) LIMITED
  • Parent Company (CMU Registry) El Asset Co. 2 Ltd
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +4402074348787

Field Value
_id 281745
Type T-4
rank 0.0706241
CMU ID EL0036
Auction Name 2025-26 (T-4) Four Year Ahead Capacity Auction
Component ID EL0036
Delivery Year 2025
De-Rated Capacity (empty)
OS Grid Reference TQ 702 814
Location and Post Code Land at Stanhope Industrial Estate, Wharf Road, Standford-Le-Hope SS17 0EH
Connection / DSR Capacity (empty)
Primary Fuel of Component (empty)
Generating Technology Class Reciprocating engines
Description of CMU Components 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Stanford le-hope
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Post-Refurbishing De-Rated Capacity (empty)
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 12739
Type T-4
CMU ID EL0036
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2025-26 (T-4) Four Year Ahead Capacity Auction
CM Unit Name Stanford Le-hope A
CM Unit Type Non CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2025
Opt Out Status Opt-In
Opt-Out Reason (empty)
Parent Company El Asset Co. 2 Ltd
DSR Test Method (empty)
Is FCM required (empty)
CM Unit Category New Build Generating CMU
Storage Facility No
De-Rated Capacity 19.094
Name of Applicant EL (SLH) LIMITED
Primary Fuel Type Gas
Registered Holder (empty)
Annual Penalty Cap (empty)
Monthly Penalty Cap (empty)
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover 190940
Termination Fee 1 Rate (empty)
Termination Fee 2 Rate (empty)
Termination Fee 3 Rate (empty)
Termination Fee 4 Rate (empty)
Termination Fee 5 Rate (empty)
Connection / DSR Capacity 20
Maximum Obligation Period 15
Capacity Agreement Awarded (empty)
Pre-Qualification Decision Not Prequalified
Capacity obligation Summary (empty)
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Distribution
Unique Agreement Identifier (empty)
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 19.094
Term of the Capacity Agreement (empty)
Nature of the Security Interest (empty)
CMU confirmed entry into Auction (empty)
Is Connection Agreement required (empty)
Pre-Refurbishment Bidding Status (empty)
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement (empty)
List of Traded Capacity Obligations (empty)
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation (empty)
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies (empty)
Secondary Trading Contact - Telephone '+4402074348787
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded (empty)
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid (empty)
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required (empty)
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest (empty)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round (empty)
Long-Stop Date for the Minimum Completion Requirement (empty)