Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.
Field | Value |
---|---|
_id | 375710 |
Type | T-4 |
rank | 0.0706241 |
CMU ID | HEAT19 |
Auction Name | 2023-24 (T-4) Four Year Ahead Capacity Auction |
Component ID | HEAT19 |
Delivery Year | 2023 |
De-Rated Capacity |
null |
OS Grid Reference | SX 860 760 |
Location and Post Code | Heathfield Landfill, John Acres Lane, Kingsteignton, Devon, TQ12 3GP |
Connection / DSR Capacity |
null |
Primary Fuel of Component |
null |
Generating Technology Class | Reciprocating engines |
Description of CMU Components | The CMU at the Heathfield Landfill site in Devon will be made up of three reciprocating engines generating from natural gas. In their current state, these engines have been designed to generate from landfill gas, but will be converted to natural gas and then recommissioned, ahead of the delivery year. The three components of the CMU (referenced VIR074, VIR079 and VIR080) are Cummins QSV91 units, built in 2008 and rated at 1,750kW. Each engine generates at 415V, which is then stepped up to 11kV and then to 33kV for export. |
Permitted on-Site Generating Unit |
null |
Pre-Refurbishing De-Rated Capacity |
null |
Post-Refurbishing De-Rated Capacity |
null |
Generating Capacity of on-site Generating Unit |
null |
Field | Value |
---|---|
_id | 9917 |
Type | T-4 |
CMU ID | HEAT19 |
Auction | Capacity Auction |
Agent Name |
null |
Beta Value |
null |
Auction Name | 2023-24 (T-4) Four Year Ahead Capacity Auction |
CM Unit Name | Heathfield Gas Peaking |
CM Unit Type | Non CMRS |
TEC Deferral |
null |
Unproven DSR |
null |
Delivery Year | 2023 |
Opt Out Status | Opt-In |
Opt-Out Reason |
null |
Parent Company | Viridor Waste Limited |
DSR Test Method |
null |
Is FCM required | Yes |
CM Unit Category | Refurbishing Generating CMU |
Storage Facility | No |
De-Rated Capacity |
null |
Name of Applicant | Valencia Waste Management Limited |
Primary Fuel Type | Gas |
Registered Holder | Valencia Waste Management Limited |
Annual Penalty Cap | 1 |
Monthly Penalty Cap | 2 |
Proven DSR Capacity |
null |
DSR Bidding Capacity |
null |
Amount of Credit Cover | (empty) |
Termination Fee 1 Rate | £5000.00 /MW |
Termination Fee 2 Rate | £25000.00 /MW |
Termination Fee 3 Rate | £10000.00 /MW |
Termination Fee 4 Rate | £15000.00 /MW |
Termination Fee 5 Rate | £35000.00 /MW |
Connection / DSR Capacity | 5 |
Maximum Obligation Period | 3 |
Capacity Agreement Awarded | Yes |
Pre-Qualification Decision | Prequalified |
Capacity obligation Summary |
null |
Pre-Refurbishing CMU Status | Opt-Out |
Transmission / Distribution | Distribution |
Unique Agreement Identifier | CAN-2023-HEAT19-001 |
New Build Yet to Satisfy FCM | Yes |
Planning Consents Conditions |
null |
Anticipated De-Rated Capacity |
null |
Term of the Capacity Agreement | 1 |
Nature of the Security Interest |
null |
CMU confirmed entry into Auction | Yes |
Is Connection Agreement required |
null |
Pre-Refurbishment Bidding Status | Post-Refurbishing Only |
Secondary Trading Contact - Email | [email protected] |
Date for provision of deferred TEC |
null |
Pre-Refurbishing De-Rated Capacity | (empty) |
Date of Issue of Capacity Agreement | 2020-04-17 |
List of Traded Capacity Obligations |
null |
Post-Refurbishing De-Rated Capacity | 4.749 |
Auction Acquired Capacity Obligation | 4.749 |
Date of Issue of DSR Test Certificate |
null |
Has Capacity Agreement been Suspended |
null |
Period for which the transfer applies |
null |
Secondary Trading Contact - Telephone | '+441869879497 |
Capacity Agreement has been Terminated |
null |
Duration of Capacity Agreement Awarded | 1 |
Date for Financial Commitment Milestone | 2021-07-18 |
Delivery Years for which Agreement Valid | 2023/2024 |
Connection Agreement Deferral Declaration |
null |
Date of Termination of Capacity Agreement |
null |
Latest Date SCM is expected to be achieved |
null |
Subject to Substantial Completion Milestone |
null |
Subject to a Minimum Completion Requirement | Yes |
Earliest Date SCM is expected to be achieved |
null |
Is copy of Grid Connection Agreement required |
null |
Anticipated Pre-Refurbishing De-Rated Capacity | (empty) |
Anticipated Post-Refurbishing De-Rated Capacity | 4.749 |
Legal Name of any Person with a Security Interest |
null |
Date for provision of deferred Connection Agreement |
null |
Duration of Capacity Agreement in First Bidding Round | 1 |
Long-Stop Date for the Minimum Completion Requirement | 2024-10-01 |