High Street, Waterham, nr Faversham, Kent ME13 9EJ Map

General Information

Key Details
  • Description 6 CHP engines horticultural environment with no auxiliiary load
  • Auction 2021-22 (T-4) Four Year Ahead Capacity Auction
  • Delivery Year 2021
Geocoding Status: Yes

Technical Capacity Information

Capacity Metrics
  • De-Rated Capacity (Component DB) N/A
  • De-Rated Capacity (CMU Registry) 8.12
  • Connection Capacity (CMU Registry) 9.02 MW
  • Anticipated Capacity (CMU Registry) 8.10 MW

Note: De-rated capacity typically accounts for availability factors. Connection capacity represents the maximum grid connection size. Values sourced from Component database or CMU Registry as indicated.

Contact & Ownership

Company Information
  • Applicant / Company Name FLEXITRICITY LIMITED
  • Parent Company (CMU Registry) RESERVE POWER HOLDINGS (JERSEY) LIMITED
  • Secondary Trading Email (CMU Registry) [email protected]
  • Secondary Trading Phone (CMU Registry) +441312218100

Field Value
_id 282870
Type T-4
rank 0.0573088
CMU ID FLXR01
Auction Name 2021-22 (T-4) Four Year Ahead Capacity Auction
Component ID 888801
Delivery Year 2021
De-Rated Capacity (empty)
OS Grid Reference TR 076 627
Location and Post Code High Street, Waterham, nr Faversham, Kent ME13 9EJ
Connection / DSR Capacity (empty)
Primary Fuel of Component (empty)
Generating Technology Class CHP and autogeneration
Description of CMU Components 6 CHP engines horticultural environment with no auxiliiary load
Permitted on-Site Generating Unit (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Post-Refurbishing De-Rated Capacity (empty)
Generating Capacity of on-site Generating Unit (empty)

Field Value
_id 5577
Type T-4
CMU ID FLXR01
Auction Capacity Auction
Agent Name (empty)
Beta Value (empty)
Auction Name 2021-22 (T-4) Four Year Ahead Capacity Auction
CM Unit Name FLEX01
CM Unit Type Non CMRS
TEC Deferral (empty)
Unproven DSR (empty)
Delivery Year 2021
Opt Out Status Opt-In
Opt-Out Reason (empty)
Parent Company RESERVE POWER HOLDINGS (JERSEY) LIMITED
DSR Test Method (empty)
Is FCM required (empty)
CM Unit Category Existing Generating CMU
Storage Facility No
De-Rated Capacity 8.115
Name of Applicant FLEXITRICITY LIMITED
Primary Fuel Type Gas
Registered Holder FLEXITRICITY LIMITED
Annual Penalty Cap 1
Monthly Penalty Cap 2
Proven DSR Capacity (empty)
DSR Bidding Capacity (empty)
Amount of Credit Cover (empty)
Termination Fee 1 Rate £5000.00 /MW
Termination Fee 2 Rate £25000.00 /MW
Termination Fee 3 Rate £10000.00 /MW
Termination Fee 4 Rate £15000.00 /MW
Termination Fee 5 Rate £35000.00 /MW
Connection / DSR Capacity 9.017
Maximum Obligation Period 1
Capacity Agreement Awarded Yes
Pre-Qualification Decision Prequalified
Capacity obligation Summary 01/10/2021 - 30/09/2022:5.100 MW
Pre-Refurbishing CMU Status (empty)
Transmission / Distribution Distribution
Unique Agreement Identifier CAN-2021-FLXR01-001
New Build Yet to Satisfy FCM (empty)
Planning Consents Conditions (empty)
Anticipated De-Rated Capacity 8.1
Term of the Capacity Agreement 1
Nature of the Security Interest (empty)
CMU confirmed entry into Auction Yes
Is Connection Agreement required (empty)
Pre-Refurbishment Bidding Status (empty)
Secondary Trading Contact - Email [email protected]
Date for provision of deferred TEC (empty)
Pre-Refurbishing De-Rated Capacity (empty)
Date of Issue of Capacity Agreement 2018-03-20
List of Traded Capacity Obligations T1: -3.015 MW
Post-Refurbishing De-Rated Capacity (empty)
Auction Acquired Capacity Obligation 8.115
Date of Issue of DSR Test Certificate (empty)
Has Capacity Agreement been Suspended (empty)
Period for which the transfer applies T1: 01/10/2021 - 30/09/2022
Secondary Trading Contact - Telephone '+441312218100
Capacity Agreement has been Terminated (empty)
Duration of Capacity Agreement Awarded 1
Date for Financial Commitment Milestone (empty)
Delivery Years for which Agreement Valid 2021/2022
Connection Agreement Deferral Declaration (empty)
Date of Termination of Capacity Agreement (empty)
Latest Date SCM is expected to be achieved (empty)
Subject to Substantial Completion Milestone (empty)
Subject to a Minimum Completion Requirement (empty)
Earliest Date SCM is expected to be achieved (empty)
Is copy of Grid Connection Agreement required (empty)
Anticipated Pre-Refurbishing De-Rated Capacity (empty)
Anticipated Post-Refurbishing De-Rated Capacity (empty)
Legal Name of any Person with a Security Interest (empty)
Date for provision of deferred Connection Agreement (empty)
Duration of Capacity Agreement in First Bidding Round 1
Long-Stop Date for the Minimum Completion Requirement (empty)