Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, ML2 0EF (4 components)
  • • 49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly …
  • • 49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
  • • 49.9MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly …
Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, Scotland, ML2 0EF, United Kingdom (2 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Storage (Duration 1h)
Active - 2024-25 (T-4)