Zenobe Stalybridge Limited

3 unique locations 6 components Page 1 of 1
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
  • • 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
  • • 75MW battery storage located near to the National Grid Stalybridge substation.
Storage (Duration 2h) Storage (Duration 4h)
58.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land to Far Souracre, SK15 3DA (2 components)

Lithium ion battery storage plant

Storage (Duration 5h)
31.4 MW
Active - 2028-29 (T-4)
Adjacent to National Grid Stalybridge substation SK15 3DA. (1 components)

Lithium ion battery storage plant.

Storage (Duration 4h)
15.4 MW
Active - 2027-28 (T-4)
Showing locations 1 - 3 of 3