Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Willington Power Limited

4 unique locations 19 components Page 1 of 1
Map View
Plot C, Land at Severn Road Avonmouth BS10 7SE (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (2)

Storage (Duration 2h)
27.3 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE (9 components)
  • • BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain. (3)
  • • BritNed is a 1200MW (TEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
  • • BritNed is a electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
BritNED (Netherlands)
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
BARNS UNIT C AYCHLEY FARM MARKET DRAYTON SHROPSHIRE TF9 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
SHED BARN C NORTH ROAD ABINGTON CAMBRIDGESHIRE CB21 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Showing locations 1 - 4 of 4