Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Willington Power Limited

4 unique locations 21 components Page 1 of 1
Map View
LAND AT L C P AUTOSURE BRIDGE ROAD ASHFORD TN23 1BB (8 components)

CMU consisting of multiple reciprocating engines and alternators (5)

Reciprocating engines
3.9 MW
Active - 2024-25 (T-4), 2023-24 (T-4), 2023-24 (T-1) (and 4 more)
Plot C Land at Severn Road Avonmouth BS10 7SE (4 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. … (2)

Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4)
Willington Power Station, Twyford Road, Willington, Derby, DE65 6PP (8 components)
  • • Unit 1 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam … (3)
  • • Unit 2 of a new combined cycle power station comprising the latest technology gas turbine, heat recovery steam generator, steam … (2)
Combined Cycle Gas Turbine (CCGT)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2021-22 (T-4) (and 1 more)
Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE (9 components)
  • • BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain. (3)
  • • BritNed is a 1200MW (TEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
  • • BritNed is a electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
BritNED (Netherlands)
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Showing locations 1 - 4 of 4