Search Map View Statistics Support Us Help Login Register

Waterswallows Energy Limited

199 unique locations 668 components Page 1 of 4
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (4 components)

29MW of DSR (3)

DSR
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2020-21 (T-1)
Water Mill Clough Oldham Lancashire OL2 (1 components)

EV charging at residential premises

DSR
Inactive - 2023-24 (T-1)
Water Lane Chelveston WELLINGBOROUGH NORTHAMPTONSHIRE NN9 (1 components)

EV charging at residential premises

DSR
Inactive - 2023-24 (T-1)
Wimbourne Bournemouth BH21 5EP (4 components)

Water treatment centre (3)

DSR
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 1 more)
Francis Avenue Bournemouth BH11 8NX (4 components)

Water treatment centre (3)

DSR
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 1 more)
Christchurch Bournemouth BH23 2JY (4 components)

Water treatment centre (3)

DSR
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 1 more)
Braunton Road Ashford Barnstaple Devon EX31 4BR (4 components)

Water treatment centre (3)

DSR
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 1 more)
Chenhalls Road St Erth Hale Cornwall TR27 6LA (4 components)

Water treatment centre (3)

DSR
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 1 more)
Northumbrian Water Plc Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (3 components)

2 MW of demand reduction (2)

DSR
Inactive - 2022-23 (T-4), 2019-20 (T-1)
Water Treatment Plant & Premises, Land to the south of Rumer Hill Road, Cannock WS11 8EX (2 components)
  • • Gas fired generating unit(s)
  • • Gas fired generating units
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (5 components)

Mix of load reduction and standby generation (4)

DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Cranbrook CHP, Honiton Road, Cranbrook, Exeter, EX5 2DX (3 components)

A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP … (2)

Combined Heat and Power (CHP)
Inactive - 2022-23 (T-4), 2019-20 (T-1)
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PE (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

DSR
Inactive - 2022-23 (T-1), 2021-22 (T-4)
Red Roofs Nursery Limited, Dunswell Road, Cottingham, Hull, HU16 4JT (1 components)

A gas engine CHP site providing hot water to agricultural greenhouses

Combined Heat and Power (CHP)
Inactive - 2022-23 (T-4)
Essex & Suffolk Water PLC Pumping Station No 1 Feeder 1 Hatfield Road Langford Chelmsford Essex, CM9 6QA (3 components)

3 MW of demand reduction (2)

DSR
Inactive - 2022-23 (T-4), 2019-20 (T-1)
Water Orton, Birmingham, B46 1NU (2 components)

Gas fired reciprocating engines.

Reciprocating engines
Inactive - 2022-23 (T-4)
KGV Pumping Station, East Camperdown Road, Dundee, DD1 3LG (2 components)

Water pumping station comprising of electrical pumps that can be modulated or turned off.

DSR
Inactive - 2022-23 (T-4)
Elmer Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (5 components)

Combination of load curtailment and standby generation (4)

DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Thames Water Sewage Treatment Works Ducklington Lane Witney OX28 5JH (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Storage Storage (Duration 0.5h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Javelin Park Energy From Waste Plant, Javelin Park Bath Road Near Haresfield, Gloucestershire (6 components)

Energy from Waste facility for the combustion of waste and the generation of energy, comprising the main EfW facility, a Bottom Ash processing facility and Education/Visitor Centre, together with Associated/Ancillary … (3)

Energy from Waste
Inactive - 2022-23 (T-4), 2022-23 (T-3), 2020-21 (T-1) (and 1 more)
Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (1 components)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

DSR
Inactive - 2021-22 (T-4)
Morcott WTW, Wing Water Treatment Works, Morcott Road, Morcott Wing, OAKHAM Leicestershire, LE15 8SA, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Hungry Snout RWP Crichness Duns Scottish Borders TD11 3SN (3 components)

Hungry Snout Water Pumping Station (3)

DSR
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Waters Meeting Road, Bolton, BL1 8HQ (2 components)
  • • Battery Storage Facility
  • • Energy facility comprising of reciprocating engine sets
Storage OCGT and Reciprocating Engines
Inactive - 2021-22 (T-4)
Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (1 components)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

DSR
Inactive - 2021-22 (T-4)
Allington Lane, River Itchen Water Treatment Works, Eastleigh, SO30 3HP (1 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

DSR
Inactive - 2020-21 (T-1)
Glandford WS, Glandford Water Treatment Work, Glandford Road, Glandford, HOLT Norfolk, NR25 7TR, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Alton WW, ALTON WATER WW, Holbrook Lane, Stutton, IPSWICH, IP9 2RY (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Hall WTW, Hall Water Treatment Works, Collingham Road, Newton-On-Trent, LINCOLN, LN1 2LL (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
DAWDON SEWAGE PUMPING STN, SEAHAM, NON PAF ADDRESS, SEAHAM BATHING WATER SCHEME, SR7 7 (1 components)

On site reduction in consumption

DSR
Active - 2024-25 (T-1)
M42, Water Orton, Birmingham B46 1NU (2 components)

gas fired reciprocating engines

Inactive - 2020-21 (T-4)
Bures WTW, Bures Water Treatment Works, Colchester Road, BURES Suffolk, CO8 5BB, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Empingham Raw Water Booster, EMPINGHAM RAW WATER BOOSTER, Off Stamford Road, Empingham, STAMFORD Lincolnshire, LE15 8PG, (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Whilton STW, Anglian Water WRC, Whilton Locks, Whilton, NORTHAMPTON, NN11 2NH (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Glenhove TWP 1 Cumbernauld North Lanarkshire G67 4AA (1 components)

Glenhove Water Pumping Station

DSR
Inactive - 2019-20 (T-1)
Gowanbank TWP Gowanbank Armadale Bathgate (1 components)

Gowanbank Water Pumping Station

DSR
Inactive - 2019-20 (T-1)
Muiresk RWP Muiresk Turriff Aberdeenshire (2 components)

Muiresk Water Pumping Station

DSR
Inactive - 2019-20 (T-1)
Waterswallows Road Buxton Derbyshire SK17 7JB (7 components)
  • • 2.115MW Diesel and/or dual fuel reciprocating engine
  • • 2.115MW Diesel and/or gas dual fuel reciprocating engine
  • • 2.115mw diesel and/or gas dual fuel reciprocating engine
  • • ... and 2 more unique descriptions
OCGT and Reciprocating Engines
Inactive - 2018-19 (T-1)
Waterswallows Road Buxton Derbyshire SK17 UK (7 components)
  • • 2.115MW Diesel and/or dual fuel reciprocating engine
  • • 2.115MW Diesel and/or gas dual fuel reciprocating engine
  • • 2.115mw diesel and/or gas dual fuel reciprocating engine
  • • ... and 2 more unique descriptions
Inactive - 2017-18 (T-1)
Water Lane, Tiverton, Devon, EX16 (1 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

DSR
Active - 2025-26 (T-1)
Water Park Road, Bideford, Devon, EX39 (1 components)

Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.

DSR
Active - 2025-26 (T-1)
Showing locations 1 - 50 of 199