Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (26 components)
  • • The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU … (3)
  • • The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU … (2)
Hydro
90.7 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Maentwrog Power Station Magnox Ltd Maentwrog nr Blaenau Ffestiniog Gwynedd LL414HY UK (14 components)

Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd … (5)

Hydro
78.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
47-53 Charterhouse Street, London, EC1M 6PB (17 components)

A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (5)

CHP and autogeneration Combined Heat and Power (CHP)
21.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h)
20.3 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (11 components)

Existing Generation on existing site - CHP (5)

Combined Heat and Power (CHP)
14.8 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 4 more)
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (5 components)
  • • CMU ID 22GER1, a new build battery storage CMU
  • • CMU ID 22GER4, a new build battery storage CMU
  • • CMU ID 23GER1, a new build battery storage CMU
  • • ... and 1 more unique descriptions
Storage (Duration 1h)
7.6 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Monkerton Energy Centre, Tithebarn Lane, Exeter, Devon, EX1 3RH (5 components)

A gas engine CHP site providing hot water to a local district heating network (5)

Combined Heat and Power (CHP)
4.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Elephant Park Energy Centre, Rodney Road, London, SE17 1FJ (16 components)
  • • A site with two gas engine CHPs, providing hot water to a local district heating network (4)
  • • A site with two gas engine CHPs providing hot water to a local district heating network
Combined Heat and Power (CHP)
4.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 4 more)
Cranbrook CHP2, Honiton Road, Cranbrook, Exeter, EX5 2DX (10 components)

A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP (5)

Combined Heat and Power (CHP)
3.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
GMV Energy Centre, 3-5 PEARTREE WAY, LONDON, SE10 0GY (5 components)

A gas engine CHP site providing hot water to a local district heating network (5)

Combined Heat and Power (CHP)
2.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
MILLBROOK PARK ENERGY CENTRE, ROYAL ENGINEERS WAY, LONDON, NW7 1TF (6 components)

A gas engine CHP site providing hot water to a local district heating network (5)

Combined Heat and Power (CHP)
2.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (5 components)

A gas engine CHP site providing hot water to a local district heating network (5)

Combined Heat and Power (CHP)
2.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Michelin Tyre Company Limited, Campbell Road, Stoke On Trent, Staffordshire, ST4 4EY (9 components)

A gas engine CHP site providing hot water to an industrial unit (5)

Combined Heat and Power (CHP)
1.6 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 5 more)
Drayton Garden Village CHP, Porters Way, Hillingdon, Greater London, UB7 9AA (10 components)

A gas engine CHP site providing hot water to a local district heating network (5)

Combined Heat and Power (CHP)
1.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (10 components)

A gas engine CHP site providing hot water to a local district heating network (5)

Combined Heat and Power (CHP)
1.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
ENERGY CENTRE, 13 HOOKERS ROAD, WALTHAMSTOW, LONDON, E17 6DPTQ 358 896 , (5 components)

A gas engine CHP site providing hot water to a local district heating network (5)

Combined Heat and Power (CHP)
1.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Colindale CHP, Joslin Avenue, Barnet, London, NW9 5HW (10 components)

A gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel (8)

Combined Heat and Power (CHP)
1.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Myatts Field CHP, Akerman Road, Lambeth, London, SW9 6SN (10 components)

A gas engine CHP site providing hot water to a local district heating network (8)

Combined Heat and Power (CHP)
0.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Cranbrook CHP1, Honiton Road, Cranbrook, Exeter, EX5 2DX (8 components)
  • • A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV … (5)
  • • A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV … (3)
Combined Heat and Power (CHP)
0.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Maple Quay CHP, Montreal House, Surrey Quay Road, Rotherhithe, London, SE16 7AP (10 components)

A gas engine CHP site providing hot water to a local district heating network (8)

Combined Heat and Power (CHP)
0.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Cannon Wharf CHP, Yeoman Street, London, SE8 5DT (10 components)

A gas engine CHP site providing hot water to a local district heating network (5)

Combined Heat and Power (CHP)
0.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Barrier Park CHP, North Woolwich Road, Silvertown, London, E16 2HP (10 components)

A gas engine CHP site providing hot water to a local district heating network (5)

Combined Heat and Power (CHP)
0.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (10 components)

A gas engine CHP site providing hot water to a local district heating network (5)

Combined Heat and Power (CHP)
0.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Bath CHP, Midland Road, Bath, BA2 3EW (10 components)

A gas engine CHP site providing hot water to a local district heating network (8)

Combined Heat and Power (CHP)
0.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
ST. BLAISE AVENUE WATER ORTON BIRMINGHAM WEST MIDLANDS B46 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
SURREY WATER ROAD LONDON SE16 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Sweet Water Park Merthyr Tydfil Mid Glamorgan CF48 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Sweet Water Park Trefechan MERTHYR TYDFIL MID GLAMORGAN CF48 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
THE MOORINGS BURTON WATERS LINCOLN LINCOLNSHIRE LN1 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
The Mount, Virginia Water, Surrey, GU25 (4 components)

EV charging on residential premises (4)

DSR
Active - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1) (and 1 more)
THE PADDOCKS PARISH ROOM CROFT WATERS UPTON TELFORD SHROPSHIRE TF6 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
The Water Gardens HENLEY-IN-ARDEN West Midlands B95 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
TRUMPSGREEN AVENUE VIRGINIA WATER SURREY GU25 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Trumpsgreen Road Virginia Water Surrey GU25 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
VIEW FARM DUKES DRIVE ASHFORD-IN-THE-WATER BAKEWELL DERBYSHIRE DE45 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Water Farm Tewin Water WELWYN Hertfordshire AL6 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WATER LANE GEDLING NOTTINGHAM NOTTINGHAMSHIRE NG4 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WATER LANE LEEDS LS12 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WATER LANE MELBOURN ROYSTON HERTFORDSHIRE SG8 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WATER LANE MIDDLESTOWN WAKEFIELD WF4 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WATER LANE PURFLEET ESSEX RM19 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WATER LANE, PURFLEET, ESSEX, RM19 (4 components)

EV charging on residential premises (4)

DSR
Active - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1) (and 1 more)
WATER LANE RADCLIFFE-ON-TRENT NOTTINGHAM NG12 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WATER LANE WOTTON-UNDER-EDGE GLOUCESTERSHIRE GL12 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WATER MEADOW DRIVE DENHOLME BRADFORD BD13 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WATER MEADOWS LONGRIDGE LANCASHIRE PR3 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Water Meadows Worksop Nottinghamshire S80 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WATER MEADOW WAY WENDOVER AYLESBURY HP22 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Water Meadow Way Wheaton Aston Stafford Staffordshire ST19 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WATER ORTON CLOSE TOTON NOTTINGHAM NOTTINGHAMSHIRE NG9 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Showing locations 1 - 50 of 87