• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU …
(3)
-
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU …
(2)
90.7 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
(5)
21.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
4.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• A site with two gas engine CHPs, providing hot water to a local district heating network
(4)
-
• A site with two gas engine CHPs providing hot water to a local district heating network
4.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)
A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
(5)
3.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
2.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
2.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
2.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to an industrial unit
(5)
1.6 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 5 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
1.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
1.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
1.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel
(8)
1.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(8)
0.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
-
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV …
(5)
-
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV …
(3)
0.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
A gas engine CHP site providing hot water to a local district heating network
(8)
0.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
0.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
0.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(5)
0.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A gas engine CHP site providing hot water to a local district heating network
(8)
0.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(2)
Active -
2024-25 (T-1),
2023-24 (T-4)
29MW of DSR
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
Water treatment centre
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Water treatment centre
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Water treatment centre
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Water treatment centre
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Water treatment centre
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• A standby diesel generator on a waster water treatment works.
(3)
-
• A standby diesel generator on a waste water treatment works.
(2)
Active -
2028-29 (T-4),
2027-28 (T-4),
2024-25 (T-4)
(and 6 more)
-
• Water source Heat Pumps at 1883KW each
(2)
-
• Water source heat pump at 1883kW each
(2)
-
• Water source Heat Pumps at 1883KW each - located at Horticultural site
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 3 more)
-
• Water source Heat Pumps at 1748KW each
(2)
-
• Water source Heat Pumps at 1748KW each - located at Horticultural site
(2)
Active -
2027-28 (T-4),
2024-25 (T-1),
2023-24 (T-4)
(and 1 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(2)
Active -
2024-25 (T-1),
2023-24 (T-4)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(2)
Active -
2024-25 (T-1),
2023-24 (T-4)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(2)
Active -
2024-25 (T-1),
2023-24 (T-4)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(2)
Active -
2024-25 (T-1),
2023-24 (T-4)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(2)
Active -
2024-25 (T-1),
2023-24 (T-4)
A gas engine CHP site providing hot water to agricultural greenhouses
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)