Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Waterswallows Energy Limited

199 unique locations 668 components Page 1 of 4
Map View
Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (26 components)
  • • The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU … (2)
  • • The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU …
Hydro
90.7 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 2 more)
Maentwrog Power Station Magnox Ltd Maentwrog nr Blaenau Ffestiniog Gwynedd LL414HY UK (14 components)

Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd … (3)

Hydro
78.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
47-53 Charterhouse Street, London, EC1M 6PB (17 components)

A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (3)

CHP and autogeneration Combined Heat and Power (CHP)
21.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h)
20.3 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (11 components)

Existing Generation on existing site - CHP (3)

Combined Heat and Power (CHP)
14.8 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 2 more)
Land at Thames Water Treatment Works, Amersham Road, Denham SL9 7AW (5 components)
  • • CMU ID 22GER4, a new build battery storage CMU
  • • CMU ID 23GER1, a new build battery storage CMU
  • • Existing generating storage battery asset with CMU ID 24GER1
Storage (Duration 1h)
7.6 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Monkerton Energy Centre, Tithebarn Lane, Exeter, Devon, EX1 3RH (5 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP)
4.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Elephant Park Energy Centre, Rodney Road, London, SE17 1FJ (16 components)
  • • A site with two gas engine CHPs, providing hot water to a local district heating network (2)
  • • A site with two gas engine CHPs providing hot water to a local district heating network
Combined Heat and Power (CHP)
4.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Cranbrook CHP2, Honiton Road, Cranbrook, Exeter, EX5 2DX (10 components)

A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP (3)

Combined Heat and Power (CHP)
3.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Douglas Water Hydroelectric Generating Station, near Inveraray, Argyll, PA32 8XT (1 components)

Hydroelectric run of river power station

Hydro
2.7 MW
Active - 2028-29 (T-4)
GMV Energy Centre, 3-5 PEARTREE WAY, LONDON, SE10 0GY (5 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP)
2.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
MILLBROOK PARK ENERGY CENTRE, ROYAL ENGINEERS WAY, LONDON, NW7 1TF (6 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP)
2.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (5 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP)
2.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Michelin Tyre Company Limited, Campbell Road, Stoke On Trent, Staffordshire, ST4 4EY (9 components)

A gas engine CHP site providing hot water to an industrial unit (3)

Combined Heat and Power (CHP)
1.6 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 2 more)
Drayton Garden Village CHP, Porters Way, Hillingdon, Greater London, UB7 9AA (10 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP)
1.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (10 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP)
1.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
ENERGY CENTRE, 13 HOOKERS ROAD, WALTHAMSTOW, LONDON, E17 6DPTQ 358 896 , (5 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP)
1.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Colindale CHP, Joslin Avenue, Barnet, London, NW9 5HW (10 components)

A gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel (3)

Combined Heat and Power (CHP)
1.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Myatts Field CHP, Akerman Road, Lambeth, London, SW9 6SN (10 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP)
0.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Cranbrook CHP1, Honiton Road, Cranbrook, Exeter, EX5 2DX (8 components)

A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered separately to the CHP (3)

Combined Heat and Power (CHP)
0.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Maple Quay CHP, Montreal House, Surrey Quay Road, Rotherhithe, London, SE16 7AP (10 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP)
0.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Cannon Wharf CHP, Yeoman Street, London, SE8 5DT (10 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP)
0.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Barrier Park CHP, North Woolwich Road, Silvertown, London, E16 2HP (10 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP)
0.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (10 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP)
0.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Bath CHP, Midland Road, Bath, BA2 3EW (10 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Combined Heat and Power (CHP)
0.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Water Pumping Station, Watson Road, MK42 6BL (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
WATER LANE WOTTON-UNDER-EDGE GLOUCESTERSHIRE GL12 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
BARN WATER LANE DENSTON NEWMARKET SUFFOLK CB8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
UNITED UTILITIES, Water Treatment Works, Preston New Road, Clifton, PRESTON, PR4 0XQ (9 components)

1.89MW Battery Storage located at United Utilities Preston (3)

DSR
Active - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
POTTEN END HILL WATER END HEMEL HEMPSTEAD HERTFORDSHIRE HP1 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
BLACK WATER DRIVE WIMBORNE DORSET BH21 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Hall WTW, Hall Water Treatment Works, Collingham Road, Newton-On-Trent, LINCOLN, LN1 2LL (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Sweet Water Park Trefechan MERTHYR TYDFIL MID GLAMORGAN CF48 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WATER LANE MELBOURN ROYSTON HERTFORDSHIRE SG8 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Sheeplands Farm, Twyford Road, Wargrave, Reading, RG10 8DJ (4 components)
  • • Water source Heat Pumps at 1748KW each (2)
  • • Water source Heat Pumps at 1748KW each - located at Horticultural site
DSR
Active - 2027-28 (T-4), 2024-25 (T-1), 2023-24 (T-4) (and 1 more)
Water Meadow Way Wheaton Aston Stafford Staffordshire ST19 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
LIME TREE WALK VIRGINIA WATER SURREY GU25 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WATERS WINSTON ROAD GAINFORD DARLINGTON DL2 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
NORTHUMBRIAN WATER, BLACKWELL PUMPING STATION, CROFT ROAD,DARLINGTON, DL2 2SD (1 components)

On site reduction in consumption

DSR
Active - 2024-25 (T-1)
Glandford WS, Glandford Water Treatment Work, Glandford Road, Glandford, HOLT Norfolk, NR25 7TR, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
YORKSHIRE WATER PLC, BLACKBURN MEADOWS, ALSING ROAD, WINCOBANK, SHEFFIELD, S9 1HF (1 components)

On site reduction in consumption

DSR
Active - 2024-25 (T-1)
THE PADDOCKS PARISH ROOM CROFT WATERS UPTON TELFORD SHROPSHIRE TF6 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
ORCHARD SEVEN WATERS LEONARD STANLEY STONE GLOUCESTERSHIRE GL10 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
YORKSHIRE WATER AUTHORITY, WATER TREATMENT WORKS, SANDHILL LANE, SUTTON ON DERWENT, YORK, YO41 4BX (1 components)

On site reduction in consumption

DSR
Active - 2024-25 (T-1)
WEST WATER CRESCENT HAMPTON VALE PETERBOROUGH CAMBRIDGESHIRE PE7 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Water Farm Tewin Water WELWYN Hertfordshire AL6 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
SURREY WATER ROAD LONDON SE16 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
WHITESHOOTS HILL BOURTON-ON-THE-WATER CHELTENHAM GLOUCESTERSHIRE GL54 (4 components)

EV charging at residential premises (3)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Showing locations 1 - 50 of 199