-
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU …
(2)
-
• The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU …
90.7 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd …
(3)
78.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network.
(3)
21.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
(3)
20.3 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
Existing Generation on existing site - CHP
(3)
14.8 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
-
• CMU ID 22GER4, a new build battery storage CMU
-
• CMU ID 23GER1, a new build battery storage CMU
-
• Existing generating storage battery asset with CMU ID 24GER1
7.6 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
A gas engine CHP site providing hot water to a local district heating network
(3)
4.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• A site with two gas engine CHPs, providing hot water to a local district heating network
(2)
-
• A site with two gas engine CHPs providing hot water to a local district heating network
4.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
(3)
3.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Hydroelectric run of river power station
2.7 MW
Active -
2028-29 (T-4)
A gas engine CHP site providing hot water to a local district heating network
(3)
2.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network
(3)
2.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network
(3)
2.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to an industrial unit
(3)
1.6 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network
(3)
1.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network
(3)
1.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network
(3)
1.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network, as well as providing some power direct via private wire to a local hotel
(3)
1.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network
(3)
0.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered separately to the CHP
(3)
0.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network
(3)
0.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network
(3)
0.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network
(3)
0.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network
(3)
0.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A gas engine CHP site providing hot water to a local district heating network
(3)
0.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
(2)
0.0 MW
Active -
2027-28 (T-4),
2024-25 (T-1)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
(2)
0.0 MW
Active -
2027-28 (T-4),
2024-25 (T-1)
CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
(2)
0.0 MW
Active -
2027-28 (T-4),
2024-25 (T-1)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
1.89MW Battery Storage located at United Utilities Preston
(3)
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
The CMU Component reduces import demand by turning on back up generation.
(2)
Inactive -
2020-21 (T-4),
2020-21 (T-1),
2019-20 (T-1)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
-
• Water source Heat Pumps at 1748KW each
(2)
-
• Water source Heat Pumps at 1748KW each - located at Horticultural site
Active -
2027-28 (T-4),
2024-25 (T-1),
2023-24 (T-4)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
On site reduction in consumption
Active -
2024-25 (T-1)
The CMU Component reduces import demand by turning on back up generation.
(2)
Inactive -
2020-21 (T-4),
2020-21 (T-1),
2019-20 (T-1)
On site reduction in consumption
Active -
2024-25 (T-1)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
On site reduction in consumption
Active -
2024-25 (T-1)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)
EV charging at residential premises
(3)
Active -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 1 more)