Search Map View Statistics Support Us Help Login Register

Waterswallows Energy Limited

16 unique locations 71 components Page 1 of 1
Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (26 components)
  • • The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU … (3)
  • • The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU … (2)
Hydro
90.7 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
47-53 Charterhouse Street, London, EC1M 6PB (17 components)

A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (5)

CHP and autogeneration Combined Heat and Power (CHP)
21.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (11 components)

Existing Generation on existing site - CHP (5)

Combined Heat and Power (CHP)
14.8 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 4 more)
Elmer Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (5 components)

Combination of load curtailment and standby generation (4)

DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Thames Water Sewage Treatment Works Ducklington Lane Witney OX28 5JH (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Storage Storage (Duration 0.5h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (1 components)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

DSR
Inactive - 2021-22 (T-4)
Hungry Snout RWP Crichness Duns Scottish Borders TD11 3SN (3 components)

Hungry Snout Water Pumping Station (3)

DSR
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Waters Meeting Road, Bolton, BL1 8HQ (2 components)
  • • Battery Storage Facility
  • • Energy facility comprising of reciprocating engine sets
Storage OCGT and Reciprocating Engines
Inactive - 2021-22 (T-4)
Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (1 components)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

DSR
Inactive - 2021-22 (T-4)
Hempstead Lane, Hempstead, Gloucester GL2 5LF (11 components)
  • • A standby diesel generator on a waster water treatment works. (3)
  • • A standby diesel generator on a waste water treatment works. (2)
DSR
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-4) (and 6 more)
Water Street , Chorley, PR7 1EX (9 components)
  • • Load curtailment (4)
  • • Load curtailment from refridgeration
DSR
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 5 more)
Water Treatment Plant & Premises, Land to the south of Rumer Hill Road, Cannock WS11 8EX (2 components)
  • • Gas fired generating unit(s)
  • • Gas fired generating units
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
HALLRAW WATER INTAKE, A57 DUNHAM BRIDGE HALL ABSTRACTION, DUNHAM RD, LN1 2JR (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (4)

DSR
Active - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (5 components)

Mix of load reduction and standby generation (4)

DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
36 EMPINGHAM RAW WATER BOOSTER INTAKE EMPINGHAM, LE15 8PE (2 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

DSR
Inactive - 2022-23 (T-1), 2021-22 (T-4)
Showing locations 1 - 16 of 16