Search Map View Statistics Support Us Help Login Register

Waterswallows Energy Limited

14 unique locations 69 components Page 1 of 1
Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (26 components)
  • • The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU … (3)
  • • The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU … (2)
Hydro
90.7 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
47-53 Charterhouse Street, London, EC1M 6PB (17 components)

A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (5)

CHP and autogeneration Combined Heat and Power (CHP)
21.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Morcott WTW, Wing Water Treatment Works, Morcott Road, Morcott Wing, OAKHAM Leicestershire, LE15 8SA, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Glandford WS, Glandford Water Treatment Work, Glandford Road, Glandford, HOLT Norfolk, NR25 7TR, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Alton WW, ALTON WATER WW, Holbrook Lane, Stutton, IPSWICH, IP9 2RY (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Hall WTW, Hall Water Treatment Works, Collingham Road, Newton-On-Trent, LINCOLN, LN1 2LL (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
M42, Water Orton, Birmingham B46 1NU (2 components)

gas fired reciprocating engines

Inactive - 2020-21 (T-4)
Bures WTW, Bures Water Treatment Works, Colchester Road, BURES Suffolk, CO8 5BB, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Empingham Raw Water Booster, EMPINGHAM RAW WATER BOOSTER, Off Stamford Road, Empingham, STAMFORD Lincolnshire, LE15 8PG, (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Whilton STW, Anglian Water WRC, Whilton Locks, Whilton, NORTHAMPTON, NN11 2NH (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Hempstead Lane, Hempstead, Gloucester GL2 5LF (11 components)
  • • A standby diesel generator on a waster water treatment works. (3)
  • • A standby diesel generator on a waste water treatment works. (2)
DSR
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-4) (and 6 more)
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (5 components)

Mix of load reduction and standby generation (4)

DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Water Street , Chorley, PR7 1EX (9 components)
  • • Load curtailment (4)
  • • Load curtailment from refridgeration
DSR
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 5 more)
Elmer Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (5 components)

Combination of load curtailment and standby generation (4)

DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Showing locations 1 - 14 of 14