Search Map View Statistics Support Us Help Login Register

Waterswallows Energy Limited

12 unique locations 40 components Page 1 of 1
Cranbrook CHP2, Honiton Road, Cranbrook, Exeter, EX5 2DX (10 components)

A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP (5)

Combined Heat and Power (CHP)
3.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Javelin Park Energy From Waste Plant, Javelin Park Bath Road Near Haresfield, Gloucestershire (6 components)

Energy from Waste facility for the combustion of waste and the generation of energy, comprising the main EfW facility, a Bottom Ash processing facility and Education/Visitor Centre, together with Associated/Ancillary … (3)

Energy from Waste
Inactive - 2022-23 (T-4), 2022-23 (T-3), 2020-21 (T-1) (and 1 more)
Morcott WTW, Wing Water Treatment Works, Morcott Road, Morcott Wing, OAKHAM Leicestershire, LE15 8SA, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Allington Lane, River Itchen Water Treatment Works, Eastleigh, SO30 3HP (1 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

DSR
Inactive - 2020-21 (T-1)
Glandford WS, Glandford Water Treatment Work, Glandford Road, Glandford, HOLT Norfolk, NR25 7TR, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Alton WW, ALTON WATER WW, Holbrook Lane, Stutton, IPSWICH, IP9 2RY (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Hall WTW, Hall Water Treatment Works, Collingham Road, Newton-On-Trent, LINCOLN, LN1 2LL (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Bures WTW, Bures Water Treatment Works, Colchester Road, BURES Suffolk, CO8 5BB, (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Empingham Raw Water Booster, EMPINGHAM RAW WATER BOOSTER, Off Stamford Road, Empingham, STAMFORD Lincolnshire, LE15 8PG, (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Whilton STW, Anglian Water WRC, Whilton Locks, Whilton, NORTHAMPTON, NN11 2NH (3 components)

The CMU Component reduces import demand by turning on back up generation. (2)

DSR
Inactive - 2020-21 (T-4), 2020-21 (T-1), 2019-20 (T-1)
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (4 components)

29MW of DSR (3)

DSR
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2020-21 (T-1)
Gillman Road, Farlington Water, Treatment Works Farlington, PO6 1BT (1 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

DSR
Inactive - 2020-21 (T-1)
Showing locations 1 - 12 of 12