Search Map View Statistics Support Us Help Login Register

Waterswallows Energy Limited

6 unique locations 44 components Page 1 of 1
Cwm Rheidol Aberystywth, Ceredigion SY23 3NF Aberystwyth (26 components)
  • • The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU … (3)
  • • The CMU is belonging to the hydro-electric power scheme ?Rheidol? close to Aberystwyth ? Ceredigion - mid-Wales. The respective CMU … (2)
Hydro
90.7 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Hempstead Lane, Hempstead, Gloucester GL2 5LF (11 components)
  • • A standby diesel generator on a waster water treatment works. (3)
  • • A standby diesel generator on a waste water treatment works. (2)
DSR
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-4) (and 6 more)
Water Street , Chorley, PR7 1EX (9 components)
  • • Load curtailment (4)
  • • Load curtailment from refridgeration
DSR
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 5 more)
Kenley Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (5 components)

Mix of load reduction and standby generation (4)

DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Elmer Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (5 components)

Combination of load curtailment and standby generation (4)

DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Waterswallows Road Buxton Derbyshire SK17 UK (7 components)
  • • 2.115MW Diesel and/or dual fuel reciprocating engine
  • • 2.115MW Diesel and/or gas dual fuel reciprocating engine
  • • 2.115mw diesel and/or gas dual fuel reciprocating engine
  • • ... and 2 more unique descriptions
Inactive - 2017-18 (T-1)
Showing locations 1 - 6 of 6