Home List View Map View Technologies Companies Support Us Help Login Register
Theme

VITAL ENERGI SOLUTIONS LIMITED

4 unique locations 31 components Page 1 of 1
Map View
Imperial College London, South Kensington Campus, SW7 2AZ (18 components)
  • • A 4.5MW gas fired reciprocating engine CHP (Engine 1). (3)
  • • A 4.5MW gas fired reciprocating engine CHP (Engine 2). (2)
Combined Heat and Power (CHP)
12.2 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 3 more)
Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX (6 components)
  • • VIT303 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX (3)
  • • VIT503 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
Combined Heat and Power (CHP)
3.0 MW
Active - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Energy Centre, Lower Mosley Street, Manchester M2 3GX (6 components)

A 3.36MW gas fired reciprocating engine CHP. (4)

Combined Heat and Power (CHP)
3.0 MW
Active - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Energy Centre, St James's University Hospital, Beckett Street, Leeds, LS9 7TF. (6 components)

4.5MWe combined heat and power (CHP) natural gas fired reciprocating engine. (4)

Combined Heat and Power (CHP)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2021-22 (T-1) (and 2 more)
Showing locations 1 - 4 of 4