Search Map View Statistics Support Us Help Login Register

VEOLIA UK LIMITED

66 unique locations 269 components Page 1 of 2
Veolia Tyseley, James Road, Tyseley, Birmingham, B11 2BA (12 components)

Municipal waste incineration plant located in Tyseley Birmingham. It is based on boilers supplying steam to a turbine-generator. (10)

Energy from Waste
72.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 8 more)
Enterprise Drive, Coven, Wolverhampton, Staffordshire WV10 7DY (8 components)

Municipal waste incineration plant located in Staffordshire. It is based on boilers supplying steam to a turbine-generator. (5)

Energy from Waste
70.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Newhaven ERF, North Quay Rd, Newhaven, East Sussex, BN9 0AB (8 components)

Steam turbine at energy from waste facility located in Newhaven East Sussex (7)

Energy from Waste
44.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (9 components)

Municipal waste incineration plant located in Marchwood Hampshire. It is based on boilers supplying steam to a turbine-generator. (5)

Coal/biomass Energy from Waste
40.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Portsmouth ERF, Quartremaine Road, Portsmouth, Hampshire PO3 5QH (9 components)

Municipal waste incineration plant located in Portsmouth Hampshire. It is based on boilers supplying steam to a turbine-generator. (5)

Coal/biomass Energy from Waste
38.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Chineham ERF, Whitmarsh Lane, Basingstoke, Hampshire, RG24 8LL (9 components)

Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator. (5)

Coal/biomass Energy from Waste
19.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Southampton General Hospital Tremona Road, Southampton, SO16 6YD (9 components)
  • • 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW (2)
  • • 2X gas reciprocating engines with a total gross power capacity of 3.973 MW (2)
  • • 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 …
CHP and autogeneration Combined Heat and Power (CHP)
10.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 6 more)
Royal Liverpool University Hospital, Prescott Street, Liverpool L7 8XP (11 components)
  • • 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity … (2)
  • • 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity … (2)
  • • 2 x Gas reciprocating engines with a total rated gross power capacity of 5.241 MW and total net power capacity …
CHP and autogeneration Combined Heat and Power (CHP)
9.6 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 7 more)
Lever House, Wood Street, Port Sunlight Wirral, CH42 4XN (2 components)

2x reciprocating gas engines with an aggregate gross capacity of 3.996 MW and net capacity of 3.908 MW (2)

Combined Heat and Power (CHP)
7.1 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Broadgreen Hospital, Thomas Drive, Liverpool L14 3LB (11 components)
  • • 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity … (2)
  • • 1 x Gas reciprocating engine with a total rated gross power capacity of 2.000 MW and total net power capacity …
  • • 1 x Gas reciprocating engine with a total rated gross power capacity of 2.185 MW and total net power capacity …
  • • ... and 1 more unique descriptions
CHP and autogeneration Combined Heat and Power (CHP)
3.4 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 7 more)
Heartland Hospital, Bordesley Green E, Birmingham, B9 5SS (2 components)

1 x gas engine with a total rated gross power capacity of 1.519MW (2)

Combined Heat and Power (CHP)
2.7 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Lister Hospital, Coreys Mill Lane, Stevenage, Hertfordshire, SG1 4AB (2 components)

1 x Gas reciprocating engine with a total rated gross power capacity of 1.400 MW and a net power capacity of 1.374 MW after considering the generator auxiliary load. (2)

Combined Heat and Power (CHP)
2.5 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Good Hope Hospital, Rectory Road, Sutton Coldfield, West Midlands, B75 7RR (2 components)

1 x gas engine with a total rated gross power capacity of 1.166 MW. (2)

Combined Heat and Power (CHP)
2.1 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Southport & Formby District General Hospital, Town Lane Kew, Southport PR8 6PN (2 components)

1 x gas reciprocating engine with a total rated gross power capacity of 0.995 MW and a net power capacity of 0.961 MW (2)

Combined Heat and Power (CHP)
1.7 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Ormskirk and District General Hospital, Wigan Road, Ormskirk, Lancashire, L39 2AZ (4 components)
  • • 1 x gas reciprocating engine with a total rated gross power capacity of 0.900 MW and a net power capacity … (2)
  • • Gas reciprocating engine (2)
CHP and autogeneration Combined Heat and Power (CHP)
1.5 MW
Active - 2028-29 (T-4), 2025-26 (T-1), 2021-22 (T-4) (and 1 more)
Estates & Facilities, North Devon District Hospital, Raleigh Park, Barnstaple, EX31 4JB (2 components)

1 x gas reciprocating engine with a total rated gross power capacity of 0.800 MW (2)

Combined Heat and Power (CHP)
1.4 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Royal Devon & Exeter Hospital (Wonford) (Unit 3112), Barrack Road, Exeter, Devon, EX2 5DW (1 components)

1 x Gas reciprocating engine with a total rated gross power capacity of 1.521 MW and net power output of 1.487MW

Combined Heat and Power (CHP)
1.3 MW
Active - 2028-29 (T-4)
Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (7 components)

In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR. (5)

DSR
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 4 more)
167 - 600 Hollands Recycling, Bentley Road South, Darlaston, WS10 8LN (7 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (5)

DSR
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 4 more)
Supply 1 Lucy Closed Loop, 16 Choats Road, Dagenham RM9 6RJ (2 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (2)

DSR
Inactive - 2022-23 (T-4), 2019-20 (T-1)
Southport and Formby District General Hospital Town Lane, Kew Southport Merseyside PR8 6PN (2 components)

1 x Gas reciprocating engines with a total rated gross power capacity of 1.008 MW (2)

Combined Heat and Power (CHP)
Inactive - 2022-23 (T-4), 2019-20 (T-1)
Supply 2 Lucy Closed Loop, 16 Choats Road, Dagenham, Essex, RM9 6RJ (2 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (2)

DSR
Inactive - 2022-23 (T-4), 2019-20 (T-1)
Southampton General Hospital, Tremona Road, Southampton, SO16 6YD (2 components)

2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW. (2)

Combined Heat and Power (CHP)
Inactive - 2022-23 (T-4), 2019-20 (T-1)
Royal Berkshire NHS Foundation Trust, London Road, Reading, RG1 5AN (2 components)

1 x Gas reciprocating engines with a total rated gross power capacity of 1.992 MW (2)

Combined Heat and Power (CHP)
Inactive - 2022-23 (T-4), 2019-20 (T-1)
Ormskirk & District General Hospital, Wigan Road, Ormskirk, Lancashire, L39 2AZ (2 components)

1 x Gas reciprocating engines with a total rated gross power capacity of 1.077 MW (2)

Combined Heat and Power (CHP)
Inactive - 2022-23 (T-4), 2019-20 (T-1)
North Devon District Hospital, North Rd, Barnstaple, EX31 4JB (2 components)

1 x Gas reciprocating engine with a total rated gross power capacity of 0.801 MW (2)

Combined Heat and Power (CHP)
Inactive - 2022-23 (T-4), 2019-20 (T-1)
Alexandra Warehouse, Ravenhead Road, St Helens, WA10 3LR (4 components)

Crystal glass recycling facility. (4)

DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1) (and 1 more)
Iwmf, Padworth Lane, Paworth Sidings, Lower Padworth, West Berkshire, RG7 4HY (4 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (4)

DSR
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1) (and 1 more)
Newhaven Erf, North Quay Rd, Newhaven, East Sussex, BN9 0AB (1 components)

Steam turbine at energy from waste facility located in Newhaven East Sussex

Coal/biomass
Inactive - 2021-22 (T-4)
Avlon Works, Severn Road, Hallen Bristol, BS10 7ZE, United Kingdom (3 components)
  • • CHP plant. (2)
  • • 2 x Gas reciprocating engines with a total rated gross power capacity of 2.758 MW.
CHP and autogeneration Combined Heat and Power (CHP)
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Four Ashes 803 - 030, 1 Station Road, Four Ashes, Wolverhampton, WV10 7PQ (2 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (2)

DSR
Inactive - 2021-22 (T-4), 2018-19 (T-1)
2 Ratty's Lane, Hoddesdon, Hertfordshire EN11 0RF (1 components)

Municipal Waste Incineration Plant located in Hoddesdon, Hertfordshire. It is based on two boilers supplying steam to a turbine-generator.

Coal/biomass
Inactive - 2021-22 (T-4)
Supply 1 Lucy Closed Loop, 16 Choats Road, Dagenham RM9 1XX (2 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (2)

DSR
Inactive - 2021-22 (T-4), 2018-19 (T-1)
Southport & Formby District General hospital, Town Lane Kew, Southport PR8 6PN (2 components)

Gas reciprocating engine. (2)

CHP and autogeneration
Inactive - 2021-22 (T-4), 2018-19 (T-1)
Supply 2 Lucy Closed Loop, 16 Choats Road RM9 1XX Essex Dagenham (2 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes. (2)

DSR
Inactive - 2021-22 (T-4), 2018-19 (T-1)
Stainland Board Mills, Holywell Green, Halifax, West Yorkshire, HX4 9PY (3 components)

CMU Component is a 7MW gas turbine embedded into unlicensed private distribution network located at HX4 9PY. Export Grid Connection Capacity is a firm 7000kVA with a power factor of … (2)

Inactive - 2020-21 (T-4), 2017-18 (T-1)
New Haven Erf, North Quay Rd, Newhaven, East Sussex, BN9 0AB (2 components)

Energy from waste facility located in Newhaven East Sussex - . It is a municipal waste incineration plant. It is based on two boilers supplying steam to one turbine-generator. Exhaust … (2)

Inactive - 2020-21 (T-4), 2017-18 (T-1)
Whitmarsh Lane, Chineham, Basingstoke, Hampshire, RG24 8LL (2 components)

Energy from waste facility located in Chineham Hampshire - Postcode RG24 8LL. It is a municipal waste incineration plant. It is based on one boiler supplying steam to one turbine-generator. … (2)

Inactive - 2020-21 (T-4), 2017-18 (T-1)
Marchwood Industrial Park, Oceanic Way, Southampton, Hampshire, SO40 4BD (2 components)

Energy from waste facility located in Marchwood Hampshire - Postcode SO40 4BD. It is a municipal waste incineration plant. It is based on two boilers supplying steam to one turbine-generator. … (2)

Inactive - 2020-21 (T-4), 2017-18 (T-1)
Broadgreen Hospital Thomas Drive Liverpool L14 3LB (2 components)

The Hospital has an Energy Center with electricity generating units and surplus power is exported to the grid.

Inactive - 2017-18 (T-1)
Royal Liverpool Hospital Prescot Street Liverpool L7 8XP (2 components)

The Hospital has an Energy Center with electricity generating units and surplus power is exported to the grid.

Inactive - 2017-18 (T-1)
Gillmoss MRF, Bridgehouse Lane, Liverpool L10 5HA (7 components)

Materials recycling plant. (5)

DSR
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 4 more)
Battlefield Enterprise Park SHREWSBURY Shropshire SY1 3TG (2 components)
  • • Energy from waste facility located in Shropshire - Postcode SY1 3TG. Station commenced operation in November 2014. It is a …
  • • Standby generator on Energy from Waste Facility at Vanguard Way- Battlefield Enterprise Park, Shrewsbury- Shropshire- SY1 3TG. The power factor …
Inactive - 2017-18 (T-1)
Southampton General Hospital Tremona Road Southampton SO16 6YD (1 components)

The Hospital has an Energy Center with electricity generating units and surplus power is exported to the grid.

Inactive - 2017-18 (T-1)
20 Marine Esplanade, Leith Docks, EH6 7LU (1 components)

1X diesel generator with a gross capacity of 2.900MW

DSR
Active - 2025-26 (T-1)
20 Marine Esplanade, Leith Docks, Leith, EH6 7LU (1 components)

1x diesel generator with a total rated gross power capacity of 2.900 MW

DSR
Active - 2024-25 (T-1)
Veolia Recycling and Energy Recovery Facility Newmarket Approach Leeds LS9 0RJ (2 components)

Recycling and Energy Recovery Facility (RERF) at Former Wholesale Market Site Newmarket Approach Leeds LS9 0RJ. Station commenced operation in November 2015. RERF capacity 20.5 tonnes per hour. RERF consists … (2)

Inactive - 2020-21 (T-4), 2017-18 (T-1)
Quartremaine Road, Portsmouth, Hampshire, PO3 5QH (2 components)

Energy from waste facility located in Portsmouth Hampshire Postcode PO3 5QH. It is a municipal waste incineration plant. It is based on two boilers supplying steam to one turbine generator. … (2)

Inactive - 2020-21 (T-4), 2017-18 (T-1)
Enterprise Drive, Coven, Wolverhampton, Staffordshire WV10 7DY, UK (4 components)
  • • 2MW diesel standby engine located in Staffordshire. It is the standby generator of the Energy from waste facility. The auxiliary … (2)
  • • Energy from waste facility located in Staffordshire - Postcode WV10 7DF. This plant was commissionned at the beginning of 2014. … (2)
Inactive - 2020-21 (T-4), 2017-18 (T-1)
Veolia ES Birmingham Limited James Road Tyseley Birmingham B11 2BA (1 components)

Energy from waste facility located in Tyseley Birmingham . It is a municipal waste incineration plant. It is based on two boilers supplying steam to one turbine generator. Exhaust steam …

Inactive - 2017-18 (T-1)
Showing locations 1 - 50 of 66