Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (3)

Storage (Duration 2h)
89.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1)
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (2 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (2)

Storage (Duration 2h)
50.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Staythorpe BESS, Staythorpe Road, Nottinghamshire, NG23 5RE (1 components)

The CMU is a Battery Energy Storage System with a planned 437MW active power output, consisting of containerised batteries.

Storage (Duration 2h)
36.0 MW
Active - 2027-28 (T-4)
Littleton Pastures Solar, Lakeshill Road, Worcestershire, WR118TS (2 components)

The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid export capacity of 22MVA.. (2)

Solar Photovoltaic
2.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
THATCHES SCHOOL LANE CHEARSLEY AYLESBURY BUCKINGHAMSHIRE HP18 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (10 components)
  • • 6 x reciprocating engines (4)
  • • Aux. load separately metered
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Diesel)
Active - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 7 more)
THATCHES THE STREET PRESTON ST. MARY SUDBURY SUFFOLK CO10 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Chippenham Station, Cocklebury Lane, Chippenham, SN15 1RS (9 components)

4 x reciprocating engines (5)

Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
Active - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
THATCHED COTTAGE WHITENAP LANE ROMSEY HAMPSHIRE SO51 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
THATCHED COTTAGE WORTLEY WOTTON-UNDER-EDGE GLOUCESTERSHIRE GL12 (4 components)

EV charging at residential premises (4)

DSR
Active - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Showing locations 1 - 10 of 10