Search Map View Statistics Support Us Help Login Register

SPARK STEAM LIMITED

3 unique locations 14 components Page 1 of 1
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (21 components)

The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year. (5)

Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
18.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED, UK (2 components)

The CMU TEES16 consists of two identical components. TEES16-2 is one gas-fired Jenbacher CHP engine with a generation capacity of 3.352MW. The total CMU generation capacity is declared 6.704MW. The … (2)

Inactive - 2020-21 (T-4), 2017-18 (T-1)
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED, UK (2 components)

The CMU TEES16 consists of two identical components. TEES16-1 is one gas-fired Jenbacher CHP engine with a generation capacity of 3.352MW. The total CMU generation capacity is declared 6.704MW. The … (2)

Inactive - 2020-21 (T-4), 2017-18 (T-1)
Showing locations 1 - 3 of 3