Search Map View Statistics Support Us Help Login Register

Sembcorp Utilities (UK) Limited

6 unique locations 43 components Page 1 of 1
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (21 components)
  • • (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT … (4)
  • • (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24G01 is a OCGT …
CHP and autogeneration Combined Heat and Power (CHP)
184.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (12 components)
  • • CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP … (3)
  • • CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24G02 is a OCGT in CHP … (2)
CHP and autogeneration Combined Heat and Power (CHP)
116.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (6 components)

CMU to comprise multiple individual storage units metered and despatched centrally (3)

Storage (Duration 2h)
34.0 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1)
Site of the former Teesside Power Station Greystone Road Grangetown Middlesbrough TS6 8JF (2 components)

Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones … (2)

Combined Cycle Gas Turbine (CCGT)
Active - 2024-25 (T-4), 2023-24 (T-4)
Former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (1 components)

CMU to comprise multiple individual storage units metered and despatched centrally

Storage (Duration 2h)
Active - 2025-26 (T-4)
"Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom" (1 components)

CMU to be comprised of new storage units

Storage (Duration 2h)
Active - 2025-26 (T-4)
Showing locations 1 - 6 of 6